From $9.95



Syndication

Statistics

Users
Total: 30,706
Visited Last 30 days: 158
Forum Messages
Total: 20,744
Last 30 days: 10
Forum Evaluations
Total: 24,149
Last 30 days: 0
Journal Entries
Total: 5,253
Last 30 days: 13
Connections
Total: 15,145
Last 30 days: 5
Downloads
Total: 81,520

Journals

Name
The-Last-Rodeo Angel Fire, NM
22,984 Visits | 248 Posts | 373 Pix | 4 Videos
Art-Camacho New Braunfels, TX
713 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
21 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
27 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
112,312 Visits | 937 Posts | 2,439 Pix | 42 Videos
MesaBarnHouse Mesa, AZ
1,031 Visits | 33 Posts | 46 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
52 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
115 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
382 Visits | 21 Posts | 118 Pix | 0 Videos
Metal-Buildings Conroe, TX
184 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
143 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
260 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
320 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,212 Visits | 40 Posts | 177 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
66,471 Visits | 176 Posts | 522 Pix | 4 Videos
DCS
372 Visits | 1 Posts | 0 Pix | 0 Videos
g4wowgwow
403 Visits | 1 Posts | 0 Pix | 0 Videos
My1stOB Melbourne, FL
549 Visits | 1 Posts | 0 Pix | 0 Videos
gypsyhillfarm East Petersburg , PA
1,172 Visits | 3 Posts | 1 Pix | 0 Videos
Our-log-home Thomaston, GA
1,062 Visits | 2 Posts | 4 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

Your Construction Bargain Strategies book is a wealth of information.
Charlene Kreidler

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Nashville, TN's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Nashville, TN on 6/28/2015

...When the highlight of the day is getting the first toilet installed. Yes that was the big accomplishment of the day. Finally no trips to HD for that! Since Sandra grouted the master bath floor, we could finally get it in permanently, so before I left today, got it set. Instead of the old beeswax ring that's standard, I thought I'd try something different and went with a foam ring. Actually a piece of cake to use and since it's a second floor I feel a little more secure in it sealing. Five times the cost of a wax ring, but what the heck; I consider the $12 well spent.


Got started running wall tile in the master shower. I really don't like running tile. A very tedious chore that never really looks good until it's grouted, so there's not interim satisfaction. 

Sandra went through and vacuumed the entire house again. Got a lot of stuff sucked up, so hopefully will finally stop tracking stuff everywhere. Basically was still some sheet rock dust and of course a bunch of dry paint over spray from a couple weeks ago.

Will continue working on the master shower this week.

Photos

Bath wall tile started with the leveling system used
A shot of the floor after grouting. Most of it is covered with paper to keep it from getting dirty during construction. But this corner is open and shows the results of the leveling system.



Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.