From $9.95



Syndication

Statistics

Users
Total: 30,710
Visited Last 30 days: 162
Forum Messages
Total: 20,744
Last 30 days: 10
Forum Evaluations
Total: 24,149
Last 30 days: 0
Journal Entries
Total: 5,253
Last 30 days: 13
Connections
Total: 15,145
Last 30 days: 5
Downloads
Total: 81,520

Journals

Name
The-Last-Rodeo Angel Fire, NM
22,984 Visits | 248 Posts | 373 Pix | 4 Videos
Art-Camacho New Braunfels, TX
714 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
21 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
27 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
112,313 Visits | 937 Posts | 2,439 Pix | 42 Videos
MesaBarnHouse Mesa, AZ
1,031 Visits | 33 Posts | 46 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
52 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
116 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
382 Visits | 21 Posts | 118 Pix | 0 Videos
Metal-Buildings Conroe, TX
184 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
143 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
262 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
320 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,212 Visits | 40 Posts | 177 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
66,471 Visits | 176 Posts | 522 Pix | 4 Videos
DCS
372 Visits | 1 Posts | 0 Pix | 0 Videos
g4wowgwow
403 Visits | 1 Posts | 0 Pix | 0 Videos
My1stOB Melbourne, FL
549 Visits | 1 Posts | 0 Pix | 0 Videos
gypsyhillfarm East Petersburg , PA
1,172 Visits | 3 Posts | 1 Pix | 0 Videos
Our-log-home Thomaston, GA
1,062 Visits | 2 Posts | 4 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

I'm having fun building so far!!! Thanks for having the website and the book. You got me started.
AG in Colorado Springs

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Larry in Nashville, TN's Journal Entries


Click here to create your own construction journal.

Posted by Larry in Nashville, TN on 6/1/2015

Hangers finished at noon on Saturday. Finishers came this morning. Four guys. Started at 8am and finished at 8pm. Man they worked! That's 48 man hours. And it looks so good. I was thinking of watching and learning, but - I'm never gonna do a large job again in my life so why? Maybe the shear joy of seeing a pro do it? But I had my day job to work on instead. It's going to take a few days to dry before they can do a second coat. I'll open the windows to help, but it just will not quit raining!


Saturday, I got the upstairs AC lines brazed and the downstairs run through the wall into the basement. But we ran short. Have to order another lineset to finish it off. But did braze it to the condenser as well. The electrical and thermostat wires are run and connected to the upstairs. All that's needed is to finish charging the system.

Helped Todd set forms for a landing on the deck stairs. Because of the ground slope, it was a bit strange to come up with something that works. He'll do the sidewalk for the front of the house and some other items. When finished, we'll have a truck of redi-mix bring a couple yards. Just catching up on things that need finishing while waiting on the drywall to be done so i can start on the bathrooms.

Photos

Before
After Like this room after room. So cool!



Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.