From $9.95



Syndication

Statistics

Users
Total: 31,030
Visited Last 30 days: 143
Forum Messages
Total: 20,757
Last 30 days: 7
Forum Evaluations
Total: 24,153
Last 30 days: 0
Journal Entries
Total: 5,282
Last 30 days: 8
Connections
Total: 15,159
Last 30 days: 3
Downloads
Total: 82,292

Journals

Name
The-Last-Rodeo Angel Fire, NM
23,756 Visits | 262 Posts | 412 Pix | 4 Videos
Geosynthetic-Systems
8 Visits | 1 Posts | 1 Pix | 0 Videos
Tanglewood Colorado Springs, CO
113,220 Visits | 947 Posts | 2,457 Pix | 42 Videos
vanphuccity Ho Chi Minh, AL
23 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
49 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
56 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
816 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
107 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
112 Visits | 1 Posts | 0 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,226 Visits | 33 Posts | 46 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
122 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
205 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
543 Visits | 21 Posts | 118 Pix | 0 Videos
Metal-Buildings Conroe, TX
290 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
234 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
349 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
429 Visits | 1 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
38,530 Visits | 40 Posts | 177 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
66,737 Visits | 176 Posts | 522 Pix | 4 Videos
DCS
442 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters


Thanks for the great book and website.
Jeremiah H., Lehi, UT

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Brian in Dome-ville, FL's Journal Entries


Click here to create your own construction journal.

Posted by Brian in Dome-ville, FL on 3/12/2015

Got the entire outside of the dome (minus the trim) repainted in about 6 hours. Amazing how it goes so easy when the paint is clean in the first place. This is the second coat of paint, and we will repaint next year as well, so we will have a good thick layer. The paint is the rainproofing, and the first paint job failed due to non-adhesion and we had a couple leaks. We power sprayed most of that off and primed and painted last year, and this year we got another good layer on. We had a tiny leak that seems to have been fixed by the second coat, so I am hopeful we will have no problems from now on. Got some of the flooring re-glued as well, and we're hoping it stays down this time.

Photos

Making the backsplash
Installed backsplash
Sink with backsplash
Painting
More painting
MORE painting



Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.