From $9.95



Syndication

Statistics

Users
Total: 31,418
Visited Last 30 days: 141
Forum Messages
Total: 20,821
Last 30 days: 20
Forum Evaluations
Total: 24,155
Last 30 days: 1
Journal Entries
Total: 5,316
Last 30 days: 7
Connections
Total: 15,187
Last 30 days: 8
Downloads
Total: 83,394

Journals

Name
duomit Rahway, NJ
9 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
114,697 Visits | 964 Posts | 2,503 Pix | 42 Videos
medicareinsurance
36 Visits | 1 Posts | 1 Pix | 0 Videos
Whiteheads-Marsh-Dom
26 Visits | 1 Posts | 0 Pix | 0 Videos
Tracispermits Patchogue, AL
38 Visits | 1 Posts | 1 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,588 Visits | 34 Posts | 52 Pix | 0 Videos
The-Last-Rodeo Angel Fire, NM
24,781 Visits | 269 Posts | 433 Pix | 4 Videos
Vintage-Oaks-Cabin New Braunfels, TX
428 Visits | 1 Posts | 0 Pix | 0 Videos
Z-Oen Dayton, OH
178 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
901 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
220 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
243 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
255 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
278 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
283 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
1,050 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
329 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
297 Visits | 1 Posts | 0 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
334 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
412 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

I’m learning so much from reading the posts on this site!
Marsha in Frankfort, KY

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Joe in Sebastopol, CA's Journal Entries


Click here to create your own construction journal.

Posted by Joe in Sebastopol, CA on 8/10/2011

Removed inside footings forms and started bringing in drain rock. All covered with a vapor barrier, then sand. 

Next was the rebar grid: Number 4 rebar, 18" on center, all tied and raised with dobies. Slab took 33 yards to get 4" slab over 2,000 sq/ft, (deeper at the footings and wall). Hired Randy and his crew to do the finish work, then sprayed on treatment to slow moisture loss. Next we pull forms and stakes.

Photos

Rebar done, ready to pour.
Wade and Walnut, wired out.
Finish crew


My Construction Website


Login to Reply




Login to comment...
Copyright 1997-2019 Consensus Group Inc.