From $9.95



Syndication

Statistics

Users
Total: 28,322
Visited Last 30 days: 139
Forum Messages
Total: 20,590
Last 30 days: 9
Forum Evaluations
Total: 24,093
Last 30 days: 16
Journal Entries
Total: 4,941
Last 30 days: 14
Connections
Total: 15,010
Last 30 days: 12
Downloads
Total: 76,095

Journals

Name
The-Last-Rodeo Angel Fire, NM
14,878 Visits | 89 Posts | 95 Pix | 2 Videos
My-first-home
8 Visits | 1 Posts | 1 Pix | 0 Videos
7th-and-last-Home-bu... Saratoga Springs, UT
16 Visits | 1 Posts | 6 Pix | 0 Videos
Tanglewood Colorado Springs, CO
104,857 Visits | 882 Posts | 2,342 Pix | 42 Videos
Bruce Fowlerville, MI
30 Visits | 1 Posts | 0 Pix | 0 Videos
697-Marlin Austin/McDade, TX
4,493 Visits | 62 Posts | 508 Pix | 0 Videos
Sparky New Harmony, UT
57 Visits | 1 Posts | 1 Pix | 0 Videos
TheHoskensProject Dome-ville, central, FL
63,811 Visits | 170 Posts | 512 Pix | 3 Videos
Mutton-Busting Nashville, TN
5,363 Visits | 127 Posts | 210 Pix | 0 Videos
sevenpeacksicf Clio, CA
40,482 Visits | 51 Posts | 326 Pix | 1 Videos
Gardner-Gate Price, UT
829 Visits | 1 Posts | 0 Pix | 0 Videos
Mahalo Logandale , AL
787 Visits | 1 Posts | 1 Pix | 0 Videos
Vilano-Beach--Water-... Saint Augustine, FL
25,016 Visits | 41 Posts | 119 Pix | 0 Videos
wumifoso
1,657 Visits | 1 Posts | 1 Pix | 0 Videos
insulation4us Wilmington, DE
1,524 Visits | 1 Posts | 4 Pix | 2 Videos
Insulationstop Latham, NY
1,530 Visits | 1 Posts | 1 Pix | 0 Videos
Our-Forever-House Omaha, NE
1,713 Visits | 2 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
35,899 Visits | 35 Posts | 140 Pix | 0 Videos
Homestead-II--Our-Ne... smithville, MO
1,624 Visits | 1 Posts | 0 Pix | 0 Videos
Larnerd-House Chenango Forks, NY
3,509 Visits | 2 Posts | 2 Pix | 0 Videos
See all journals...

Thanks to The Owner-Builder Book for having such a great forum!
Scott in Germantown, MD

Craig in Clio, CA's Journal Entries


Click here to create your own construction journal.

Posted by Craig in Clio, CA on 11/12/2008

Ron and crew finished the 4" slab on the second floor yesterday.  We're so close to buttoning up for the winter!

The previous weekend was getting ready for this pour.  Activities included putting up the Hambro steel  and plywood forms above the utility shed and bridge linking it to the master bedroom.  I hired a laborer to help out and to ensure the work got done on time.  Money well spent. 

I spent Sunday placing the first row of Faswall blocks on the second floor.  These were notched to allow rebar on the top and on the side to allow the concrete floor to be fully integrated into the wall.  Before doing this I had to remove the protective tarps and the two inches of water that had accumulated on them.  It is so much fun working in the cold when your boots and pants are soaked with water. :). 

The final prep step was to plastic wrap the heavy beams supporting the second floor to protect them from cement spills.  These beams are 8x18 #1 Doug fir and will be visible when the house is complete.  They need to be really pretty to support the overall "Prairie Style" of architecture influencing this house.

Next steps will be to seal the structure for the snow to come.  That means putting clear vinyl sheeting over the windows, tarps over doors, and building a temporary roof over the living room.  I also want to install a temporary wood stove for heating the work area.

Photos

first floor slab protection
Insulation on slab looking from MBR
Second floor plumbing can-in
Radiant for second floor
River view from the second floor
Second floor from MBR to utility shed roof (insulated)



Login to Reply




Login to comment...
Copyright 1997-2016 Consensus Group Inc.