From $9.95



Syndication

Statistics

Users
Total: 27,986
Visited Last 30 days: 146
Forum Messages
Total: 20,563
Last 30 days: 7
Forum Evaluations
Total: 24,047
Last 30 days: 7
Journal Entries
Total: 4,870
Last 30 days: 11
Connections
Total: 14,983
Last 30 days: 6
Downloads
Total: 75,260

Journals

Name
Tanglewood Colorado Springs, CO
103,347 Visits | 867 Posts | 2,317 Pix | 42 Videos
The-Last-Rodeo Angel Fire, NM
13,910 Visits | 45 Posts | 18 Pix | 0 Videos
697-Marlin Austin/McDade, TX
4,209 Visits | 54 Posts | 424 Pix | 0 Videos
TheHoskensProject Dome-ville, central, FL
63,486 Visits | 170 Posts | 512 Pix | 3 Videos
Mutton-Busting Nashville, TN
4,891 Visits | 127 Posts | 210 Pix | 0 Videos
sevenpeacksicf Clio, CA
40,130 Visits | 51 Posts | 326 Pix | 1 Videos
Gardner-Gate Price, UT
639 Visits | 1 Posts | 0 Pix | 0 Videos
Mahalo Logandale , AL
627 Visits | 1 Posts | 1 Pix | 0 Videos
Vilano-Beach--Water-... Saint Augustine, FL
24,746 Visits | 41 Posts | 119 Pix | 0 Videos
wumifoso
1,390 Visits | 1 Posts | 1 Pix | 0 Videos
insulation4us Wilmington, DE
1,346 Visits | 1 Posts | 4 Pix | 2 Videos
Insulationstop Latham, NY
1,376 Visits | 1 Posts | 1 Pix | 0 Videos
Our-Forever-House Omaha, NE
1,548 Visits | 2 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
35,564 Visits | 35 Posts | 140 Pix | 0 Videos
Homestead-II--Our-Ne... smithville, MO
1,479 Visits | 1 Posts | 0 Pix | 0 Videos
Larnerd-House Chenango Forks, NY
3,359 Visits | 2 Posts | 2 Pix | 0 Videos
HudsonHouse Omaha, NE
9,782 Visits | 4 Posts | 0 Pix | 0 Videos
Barrel-Race Houston, TX
10,861 Visits | 86 Posts | 175 Pix | 0 Videos
Cobbler-Mountain-Hom... Alexandria, VA
2,898 Visits | 1 Posts | 0 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
47,300 Visits | 44 Posts | 191 Pix | 0 Videos
See all journals...

Current Top-Rated Posters


Hi Guys, I just found this forum and find it to be very informative!
Jim in Northern California

Craig in Clio, CA's Journal Entries


Click here to create your own construction journal.

Posted by Craig in Clio, CA on 11/12/2008

Ron and crew finished the 4" slab on the second floor yesterday.  We're so close to buttoning up for the winter!

The previous weekend was getting ready for this pour.  Activities included putting up the Hambro steel  and plywood forms above the utility shed and bridge linking it to the master bedroom.  I hired a laborer to help out and to ensure the work got done on time.  Money well spent. 

I spent Sunday placing the first row of Faswall blocks on the second floor.  These were notched to allow rebar on the top and on the side to allow the concrete floor to be fully integrated into the wall.  Before doing this I had to remove the protective tarps and the two inches of water that had accumulated on them.  It is so much fun working in the cold when your boots and pants are soaked with water. :). 

The final prep step was to plastic wrap the heavy beams supporting the second floor to protect them from cement spills.  These beams are 8x18 #1 Doug fir and will be visible when the house is complete.  They need to be really pretty to support the overall "Prairie Style" of architecture influencing this house.

Next steps will be to seal the structure for the snow to come.  That means putting clear vinyl sheeting over the windows, tarps over doors, and building a temporary roof over the living room.  I also want to install a temporary wood stove for heating the work area.

Photos

first floor slab protection
Insulation on slab looking from MBR
Second floor plumbing can-in
Radiant for second floor
River view from the second floor
Second floor from MBR to utility shed roof (insulated)



Login to Reply




Login to comment...
Copyright 1997-2016 Consensus Group Inc.