From $9.95



Syndication

Statistics

Users
Total: 28,331
Visited Last 30 days: 149
Forum Messages
Total: 20,590
Last 30 days: 9
Forum Evaluations
Total: 24,093
Last 30 days: 16
Journal Entries
Total: 4,941
Last 30 days: 14
Connections
Total: 15,012
Last 30 days: 14
Downloads
Total: 76,118

Journals

Name
The-Last-Rodeo Angel Fire, NM
14,893 Visits | 89 Posts | 95 Pix | 2 Videos
My-first-home
9 Visits | 1 Posts | 1 Pix | 0 Videos
7th-and-last-Home-bu... Saratoga Springs, UT
16 Visits | 1 Posts | 6 Pix | 0 Videos
Tanglewood Colorado Springs, CO
104,871 Visits | 882 Posts | 2,342 Pix | 42 Videos
Bruce Fowlerville, MI
30 Visits | 1 Posts | 0 Pix | 0 Videos
697-Marlin Austin/McDade, TX
4,493 Visits | 62 Posts | 508 Pix | 0 Videos
Sparky New Harmony, UT
59 Visits | 1 Posts | 1 Pix | 0 Videos
TheHoskensProject Dome-ville, central, FL
63,815 Visits | 170 Posts | 512 Pix | 3 Videos
Mutton-Busting Nashville, TN
5,363 Visits | 127 Posts | 210 Pix | 0 Videos
sevenpeacksicf Clio, CA
40,488 Visits | 51 Posts | 326 Pix | 1 Videos
Gardner-Gate Price, UT
831 Visits | 1 Posts | 0 Pix | 0 Videos
Mahalo Logandale , AL
787 Visits | 1 Posts | 1 Pix | 0 Videos
Vilano-Beach--Water-... Saint Augustine, FL
25,018 Visits | 41 Posts | 119 Pix | 0 Videos
wumifoso
1,660 Visits | 1 Posts | 1 Pix | 0 Videos
insulation4us Wilmington, DE
1,525 Visits | 1 Posts | 4 Pix | 2 Videos
Insulationstop Latham, NY
1,530 Visits | 1 Posts | 1 Pix | 0 Videos
Our-Forever-House Omaha, NE
1,714 Visits | 2 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
35,900 Visits | 35 Posts | 140 Pix | 0 Videos
Homestead-II--Our-Ne... smithville, MO
1,624 Visits | 1 Posts | 0 Pix | 0 Videos
Larnerd-House Chenango Forks, NY
3,509 Visits | 2 Posts | 2 Pix | 0 Videos
See all journals...

Really glad we found the site when we did, almost make some huge mistakes; but luckily reading about other owner-builder jobs help sway our decisions in the right direction.
Barbara Pinet

Mike & Carolyn in Smithville, MO's Journal Entries


Click here to create your own construction journal.

Posted by Mike & Carolyn in Smithville, MO on 9/20/2008 8:52:48 PM

Mike finished up the hard wood installation tonight.  We had enough to do the loft and about 15 boards left over.  That includes the bad boards that we were only going to use is we had too.  We spent another $117 on supplies which I think takes us to around $1,100. I will have to add it up. 

Over the next week the trim will be completed and we will be filling and cracks and knot holes plus adding the peg and screw details to the ends. Painter is already lined up to be in after the trim and we have the cabinets, which are pre-finished, so we will install them after paint is complete. 

We also had the gutters installed and work got underway on the driveway and sidewalk.  Driveway should be complete by end of day Monday.  Gutters wont technically be complete until we pick up the rain barrels and since the granite countertops are on the trailer I'm not sure when that will be.  I still need to get the bathroom linen closet and storage cabinets made... running low on funds and they may end up being added later or being an off the shelf item.  We've been so busy with the floors that I haven’t even gotten estimates.  Maybe next week.

Photos

Living Room - looking down from loft
Kitchen - Looking down from loft
Loft...finished now - taken with just a few rows of flooring left
Bedroom and Glue Station
Bathroom
Another view of kitchen and living room
Stamped circular part of drive
View of start of drive from above
Frames for front step and walk
Front Walk and what will be a planting bed
Gutters and Air Conditioner...Gutter color matches perfectly!
And for Friends/Family…Summer had her first Gymnastics meet today, She took second in two events (yes there were more than 2 competitors... there were 4) and 4th in two. She got home and said, "What do I have to do to get first place? Tell me, I'll do it! I want the trophy!"



Login to Reply




Login to comment...
Copyright 1997-2016 Consensus Group Inc.