From $9.95



Syndication

Statistics

Users
Total: 31,198
Visited Last 30 days: 118
Forum Messages
Total: 20,786
Last 30 days: 17
Forum Evaluations
Total: 24,154
Last 30 days: 0
Journal Entries
Total: 5,302
Last 30 days: 12
Connections
Total: 15,167
Last 30 days: 2
Downloads
Total: 82,675

Journals

Name
The-Last-Rodeo Angel Fire, NM
24,293 Visits | 269 Posts | 433 Pix | 4 Videos
Vintage-Oaks-Cabin New Braunfels, TX
307 Visits | 1 Posts | 0 Pix | 0 Videos
Tanglewood Colorado Springs, CO
113,918 Visits | 955 Posts | 2,493 Pix | 42 Videos
Z-Oen Dayton, OH
49 Visits | 1 Posts | 0 Pix | 0 Videos
washougalhome Washougal, WA
742 Visits | 22 Posts | 124 Pix | 0 Videos
MadeByMelissaPdByChr... Berea, KY
113 Visits | 1 Posts | 0 Pix | 0 Videos
Geosynthetic-Systems
104 Visits | 1 Posts | 1 Pix | 0 Videos
vanphuccity Ho Chi Minh, AL
118 Visits | 2 Posts | 0 Pix | 0 Videos
MCKAY-ICF-BUILD Oconomowoc, WI
160 Visits | 1 Posts | 0 Pix | 0 Videos
Car-Rentals-in-Udaip... Delhi, AL
184 Visits | 1 Posts | 0 Pix | 0 Videos
Art-Camacho New Braunfels, TX
921 Visits | 1 Posts | 0 Pix | 0 Videos
Quijada-project-Lake... Lake Havasu City, AZ
222 Visits | 1 Posts | 0 Pix | 0 Videos
Port-Townsend-Build Sherman Oaks, CA
198 Visits | 1 Posts | 0 Pix | 0 Videos
MesaBarnHouse Mesa, AZ
1,402 Visits | 33 Posts | 46 Pix | 0 Videos
LalcoInteriors1 Mumbai, AL
220 Visits | 1 Posts | 0 Pix | 0 Videos
Stan-Tol Winter Springs, FL
296 Visits | 1 Posts | 0 Pix | 0 Videos
Metal-Buildings Conroe, TX
416 Visits | 1 Posts | 1 Pix | 0 Videos
benson-bondstone-hom... Coeur d'Alene, AL
378 Visits | 1 Posts | 0 Pix | 0 Videos
Demetrius Kansas City, KS
450 Visits | 1 Posts | 0 Pix | 0 Videos
Genes-Job Cocoa, FL
550 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
Timmy Weeks0.001
Steve0.002
James in Beaumont, TX0.002

It is good to see that this forum is still alive. It adds meaning to my life.
David in Tallahassee, FL

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Cannon in Sierra Vista, AZ's Journal Entries


Click here to create your own construction journal.

Posted by Cannon in Sierra Vista, AZ on 8/4/2008

Just to update, our slab pour went great! Matt and his guys did an awesome job. I remeasured all of the dimensions after the forms were stripped and there is not one dimension off by more than 1/4". Most are spot on. Since this is a SIP build that is pretty important, and I am very pleased. We had them pour the back patio as well, but held off on the garage apron and door slabs until all the heavy trucks are done. After Matt we had LRC come in and install the septic tank and field. That should be done any day as it is just waiting on final inspection. 

Between the septic and the slab I had the electric service brought in and I mounted a temporary post and installed our service panel. I still have to tie the ufer on and install a GFCI prior to getting the power turned on. We are now in our monsoon season so I plan on sitting tight on any further progress until the third week of September. I did send our plans to the SIP manufacturer to get the final cost run and get the panels started. They are running about five weeks out so that will be perfect for September.

Photos

Slab is done, weather building
Jake by the creek. Looks like we will have water in it about two months out of the year. Yippee!!
Septic system



Login to Reply




Login to comment...
Copyright 1997-2018 Consensus Group Inc.