From $9.95



Syndication






Statistics

Users
Total: 26,840
Visited Last 30 days: 84
Forum Messages
Total: 20,471
Last 30 days: 5
Forum Evaluations
Total: 24,012
Last 30 days: 0
Journal Entries
Total: 4,712
Last 30 days: 9
Connections
Total: 14,883
Last 30 days: 11
Downloads
Total: 72,468

Journals

Name
Tanglewood Colorado Springs, CO
96,852 Visits | 821 Posts | 2,272 Pix | 42 Videos
Mutton-Busting Nashville, TN
2,109 Visits | 61 Posts | 98 Pix | 0 Videos
TheHoskensProject Dome-ville, central, FL
61,331 Visits | 160 Posts | 478 Pix | 3 Videos
wumifoso
97 Visits | 1 Posts | 1 Pix | 0 Videos
insulation4us Wilmington, DE
116 Visits | 1 Posts | 4 Pix | 2 Videos
insulation4less Folkestone, AL
137 Visits | 1 Posts | 3 Pix | 0 Videos
697-Marlin-Near-Aust... Austin/McDade, TX
2,649 Visits | 39 Posts | 262 Pix | 0 Videos
eModernDecor South El Monte, CA
211 Visits | 1 Posts | 5 Pix | 4 Videos
Insulationstop Latham, NY
156 Visits | 1 Posts | 1 Pix | 0 Videos
Our-Forever-House Omaha, NE
365 Visits | 2 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
33,581 Visits | 35 Posts | 140 Pix | 0 Videos
Homestead-II--Our-Ne... smithville, MO
331 Visits | 1 Posts | 0 Pix | 0 Videos
The-Last-Rodeo Angel Fire, NM
11,790 Visits | 29 Posts | 10 Pix | 0 Videos
Larnerd-House Chenango Forks, NY
2,214 Visits | 2 Posts | 2 Pix | 0 Videos
HudsonHouse Omaha, NE
8,488 Visits | 4 Posts | 0 Pix | 0 Videos
Seven-Peaks-Faswall-... Graeagle, CA
38,054 Visits | 50 Posts | 320 Pix | 1 Videos
Barrel-Race Houston, TX
9,231 Visits | 86 Posts | 175 Pix | 0 Videos
Cobbler-Mountain-Hom... Alexandria, VA
1,638 Visits | 1 Posts | 0 Pix | 0 Videos
Vilano-Beach--Water-... Saint Augustine, FL
23,164 Visits | 39 Posts | 118 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
45,639 Visits | 44 Posts | 191 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

The site and its participants made the build doable. What I mean is, without you guys it would not have been possible. Keep up the good work.
Capt. Marc Wren



Posted by Samuel in Smyrna, DE on 6/16/2008 7:53:40 PM

The walls were poured today; didn't know it was going to happen today because the wall people told me Wednesday, so I was surprised when I got a call that they were there on site working and needed to know the rough opening for the basement window. So I immediately got on the phone to find out what was going on, because I let them know before that NO WORK! should be done without my knowledge. Well they say Wednesday was the day they should be finished with the walls, but that's not what I was told, so I just said OK and went there right away.  When I got there all most all the forms were up, I needed to put 7 sleeves in one side of the walls and I didn't have the pipe on site to do so. I had to call my wife to pick it up from the plumbing supply store. I needed 8" PVC - HD and Lowe's do not sell this. These are for duct work under the slab. During the pour it started raining really hard but we were able to get it done after it held up for like 20 min.


Login to Reply




Login to comment...
Copyright 1997-2015 Consensus Group Inc.