It's been a while since we've had time to post some new pictures... that, and apparently there's not much photogenic about electrical work! We've continued to plug along with that and are about to wrap it up. Hopefully the generator will arrive in the next week or so and the electrician "consultant" can come back to get that wired up and get the breakers in the box. Don has started the plumbing work, cutting all the holes, etc. The siding is done (except for the decorative bracket detail and the painting), so that's marked off the list. The guy from the power company came by last week and marked off the trench for the underground power line, and lo and behold, the crew showed up today to dig the trench and lay the conduit, etc. The foundation drain is in, but grading has not yet been done (still working on getting it figured out in some problem spots). The kitchen and laundry room cabinets have been ordered, as well as some other fixtures that were too good of a deal at the time to pass up, so we're crawling along!
Photos
|
Foundation Drain |
|
|
Bay Window |
|
|
Power Company Digs the Trench |
|
|
Conduit |
|
|
Filling in the Trench |
|
|
Lucy Hangs Out |
|
|
Login to Reply