From $9.95



Syndication






Statistics

Users
Total: 26,875
Visited Last 30 days: 85
Forum Messages
Total: 20,475
Last 30 days: 8
Forum Evaluations
Total: 24,012
Last 30 days: 0
Journal Entries
Total: 4,720
Last 30 days: 12
Connections
Total: 14,893
Last 30 days: 10
Downloads
Total: 72,567

Journals

Name
Mutton-Busting Nashville, TN
2,298 Visits | 65 Posts | 106 Pix | 0 Videos
TheHoskensProject Dome-ville, central, FL
61,505 Visits | 161 Posts | 481 Pix | 3 Videos
The-Last-Rodeo Angel Fire, NM
11,972 Visits | 30 Posts | 10 Pix | 0 Videos
Vilano-Beach--Water-... Saint Augustine, FL
23,283 Visits | 40 Posts | 118 Pix | 0 Videos
Tanglewood Colorado Springs, CO
97,302 Visits | 823 Posts | 2,272 Pix | 42 Videos
wumifoso
201 Visits | 1 Posts | 1 Pix | 0 Videos
insulation4us Wilmington, DE
203 Visits | 1 Posts | 4 Pix | 2 Videos
697-Marlin-Near-Aust... Austin/McDade, TX
2,782 Visits | 39 Posts | 262 Pix | 0 Videos
eModernDecor South El Monte, CA
321 Visits | 1 Posts | 5 Pix | 4 Videos
Insulationstop Latham, NY
248 Visits | 1 Posts | 1 Pix | 0 Videos
Our-Forever-House Omaha, NE
460 Visits | 2 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
33,775 Visits | 35 Posts | 140 Pix | 0 Videos
Homestead-II--Our-Ne... smithville, MO
412 Visits | 1 Posts | 0 Pix | 0 Videos
Larnerd-House Chenango Forks, NY
2,293 Visits | 2 Posts | 2 Pix | 0 Videos
HudsonHouse Omaha, NE
8,596 Visits | 4 Posts | 0 Pix | 0 Videos
Seven-Peaks-Faswall-... Graeagle, CA
38,257 Visits | 50 Posts | 320 Pix | 1 Videos
Barrel-Race Houston, TX
9,352 Visits | 86 Posts | 175 Pix | 0 Videos
Cobbler-Mountain-Hom... Alexandria, VA
1,749 Visits | 1 Posts | 0 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
45,767 Visits | 44 Posts | 191 Pix | 0 Videos
Bladenkirk White Oak, NC
1,867 Visits | 6 Posts | 4 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

I was in the library yesterday and found your book. What a godsend!! I have been reading it and decided to check out the website.
Jodenia M., Blacksburg, SC



Posted by Mike & Carolyn in Smithville, MO on 4/16/2008

We have been putting off the big expense of the sewer line and grinder pump installation and the not so big expense of the main water line.  Now, we are at the point that we can not wait any longer. Called to place the order for the installation.  They (they being the county planning and zoning department) required us to pay for the water meter before they would issue a building permit so the meter has been paid for since January, 2007 and in place since last year sometime. Then, we are responsible for running the water line from the meter to the house.  I didn’t want to have to run the heat through the winter so we have been waiting to put the main water line in and always planned on doing it with the sewer line -- saving the cost of a second company to come out and run the line.  So, the sewer company that we are required to use (which still bugs me, I'm certain I could get it done for less) is working on the cost figures for the main water line (around $800 and its over 800 feet long, I just hope we have good water pressure) the sewer hook up (with 'Y' for future expansion to main house) and grinder pump (this is required due to the small private sewer plant we are hooked to).  I'll get the bill next week, which has to be paid before they do the work. I'm estimating it to be around $6,000. Any more and we'll be waiting again.  After the bill is paid they said they could complete the work within 14 days. We're making progress again.