From $9.95



Syndication






Statistics

Users
Total: 26,789
Visited Last 30 days: 93
Forum Messages
Total: 20,466
Last 30 days: 1
Forum Evaluations
Total: 24,012
Last 30 days: 0
Journal Entries
Total: 4,704
Last 30 days: 13
Connections
Total: 14,872
Last 30 days: 3
Downloads
Total: 72,263

Journals

Name
Mutton-Busting Nashville, TN
1,848 Visits | 56 Posts | 94 Pix | 0 Videos
Tanglewood Colorado Springs, CO
96,312 Visits | 819 Posts | 2,272 Pix | 42 Videos
insulation4us Wilmington, DE
55 Visits | 1 Posts | 4 Pix | 2 Videos
insulation4less Folkestone, AL
79 Visits | 1 Posts | 3 Pix | 0 Videos
697-Marlin-Near-Aust... Austin/McDade, TX
2,545 Visits | 39 Posts | 262 Pix | 0 Videos
eModernDecor South El Monte, CA
113 Visits | 1 Posts | 5 Pix | 4 Videos
Insulationstop Latham, NY
97 Visits | 1 Posts | 1 Pix | 0 Videos
Our-Forever-House Omaha, NE
309 Visits | 2 Posts | 0 Pix | 0 Videos
TheHoskensProject Dome-ville, central, FL
61,163 Visits | 159 Posts | 472 Pix | 3 Videos
NorthPoleHome North Pole, AK
33,359 Visits | 35 Posts | 140 Pix | 0 Videos
Homestead-II--Our-Ne... smithville, MO
274 Visits | 1 Posts | 0 Pix | 0 Videos
The-Last-Rodeo Angel Fire, NM
11,644 Visits | 29 Posts | 10 Pix | 0 Videos
Larnerd-House Chenango Forks, NY
2,159 Visits | 2 Posts | 2 Pix | 0 Videos
HudsonHouse Omaha, NE
8,406 Visits | 4 Posts | 0 Pix | 0 Videos
Seven-Peaks-Faswall-... Graeagle, CA
37,838 Visits | 50 Posts | 320 Pix | 1 Videos
Barrel-Race Houston, TX
9,087 Visits | 86 Posts | 175 Pix | 0 Videos
Cobbler-Mountain-Hom... Alexandria, VA
1,525 Visits | 1 Posts | 0 Pix | 0 Videos
Vilano-Beach--Water-... Saint Augustine, FL
23,055 Visits | 39 Posts | 118 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
45,504 Visits | 44 Posts | 191 Pix | 0 Videos
Bladenkirk White Oak, NC
1,742 Visits | 6 Posts | 4 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

Just got confirmation that my "Whole Enchilada" is being shipped. Can't wait to immerse myself into all there is about becoming an O-B.
David in Pittsburg, CA



Posted by Mike & Carolyn in Smithville, MO on 4/16/2008

We have been putting off the big expense of the sewer line and grinder pump installation and the not so big expense of the main water line.  Now, we are at the point that we can not wait any longer. Called to place the order for the installation.  They (they being the county planning and zoning department) required us to pay for the water meter before they would issue a building permit so the meter has been paid for since January, 2007 and in place since last year sometime. Then, we are responsible for running the water line from the meter to the house.  I didn’t want to have to run the heat through the winter so we have been waiting to put the main water line in and always planned on doing it with the sewer line -- saving the cost of a second company to come out and run the line.  So, the sewer company that we are required to use (which still bugs me, I'm certain I could get it done for less) is working on the cost figures for the main water line (around $800 and its over 800 feet long, I just hope we have good water pressure) the sewer hook up (with 'Y' for future expansion to main house) and grinder pump (this is required due to the small private sewer plant we are hooked to).  I'll get the bill next week, which has to be paid before they do the work. I'm estimating it to be around $6,000. Any more and we'll be waiting again.  After the bill is paid they said they could complete the work within 14 days. We're making progress again.


Login to Reply




Login to comment...
Copyright 1997-2015 Consensus Group Inc.