From $9.95



Syndication

Statistics

Users
Total: 28,073
Visited Last 30 days: 148
Forum Messages
Total: 20,571
Last 30 days: 12
Forum Evaluations
Total: 24,050
Last 30 days: 3
Journal Entries
Total: 4,883
Last 30 days: 14
Connections
Total: 14,993
Last 30 days: 10
Downloads
Total: 75,425

Journals

Name
The-Last-Rodeo Angel Fire, NM
14,073 Visits | 55 Posts | 34 Pix | 1 Videos
Tanglewood Colorado Springs, CO
103,764 Visits | 870 Posts | 2,321 Pix | 42 Videos
697-Marlin Austin/McDade, TX
4,297 Visits | 54 Posts | 424 Pix | 0 Videos
TheHoskensProject Dome-ville, central, FL
63,588 Visits | 170 Posts | 512 Pix | 3 Videos
Mutton-Busting Nashville, TN
5,021 Visits | 127 Posts | 210 Pix | 0 Videos
sevenpeacksicf Clio, CA
40,227 Visits | 51 Posts | 326 Pix | 1 Videos
Gardner-Gate Price, UT
698 Visits | 1 Posts | 0 Pix | 0 Videos
Mahalo Logandale , AL
675 Visits | 1 Posts | 1 Pix | 0 Videos
Vilano-Beach--Water-... Saint Augustine, FL
24,820 Visits | 41 Posts | 119 Pix | 0 Videos
wumifoso
1,448 Visits | 1 Posts | 1 Pix | 0 Videos
insulation4us Wilmington, DE
1,408 Visits | 1 Posts | 4 Pix | 2 Videos
Insulationstop Latham, NY
1,418 Visits | 1 Posts | 1 Pix | 0 Videos
Our-Forever-House Omaha, NE
1,598 Visits | 2 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
35,653 Visits | 35 Posts | 140 Pix | 0 Videos
Homestead-II--Our-Ne... smithville, MO
1,524 Visits | 1 Posts | 0 Pix | 0 Videos
Larnerd-House Chenango Forks, NY
3,408 Visits | 2 Posts | 2 Pix | 0 Videos
HudsonHouse Omaha, NE
9,845 Visits | 4 Posts | 0 Pix | 0 Videos
Barrel-Race Houston, TX
10,936 Visits | 86 Posts | 175 Pix | 0 Videos
Cobbler-Mountain-Hom... Alexandria, VA
2,957 Visits | 1 Posts | 0 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
47,384 Visits | 44 Posts | 191 Pix | 0 Videos
See all journals...

Current Top-Rated Posters


Today, I had an introduction to the vast resources available on the OBB website. Great!
Bill in Tucson, AZ

Joe in Broken Arrow, OK's Journal Entries


Click here to create your own construction journal.

Posted by Joe in Broken Arrow, OK on 2/24/2008

Since my last post, we have completed roofing, rough wiring, plumbing top-out, structured-wiring rough, security-wire rough, and passed the multi-trade inspection. Insulation has been installed with sheetrock nearly complete. Exterior brick/rock is approximately half-completed. Cabinets have been measured and are being built. Granite paid for and on order. Interior/exterior doors have been measured and ordered. Met with trim carpenter and painter to relay game plan.

Expectations for this week include - finish sheetrock, finish exterior brick/rock, get permanent line for electric, and set meter so texturing can commence (need some heat). Attic insulation blown. Install garage doors and schedule flatwork.

Outlook beyond that - trim install in about 8-10 days. Painting to commence in 2.5 weeks.

Photos

Front elevation
Rear elevation