From $9.95



Syndication

Statistics

Users
Total: 28,223
Visited Last 30 days: 116
Forum Messages
Total: 20,584
Last 30 days: 9
Forum Evaluations
Total: 24,077
Last 30 days: 3
Journal Entries
Total: 4,927
Last 30 days: 21
Connections
Total: 14,998
Last 30 days: 1
Downloads
Total: 75,784

Journals

Name
The-Last-Rodeo Angel Fire, NM
14,577 Visits | 81 Posts | 80 Pix | 2 Videos
697-Marlin Austin/McDade, TX
4,419 Visits | 61 Posts | 499 Pix | 0 Videos
Tanglewood Colorado Springs, CO
104,535 Visits | 880 Posts | 2,339 Pix | 42 Videos
Sparky New Harmony, UT
28 Visits | 1 Posts | 1 Pix | 0 Videos
TheHoskensProject Dome-ville, central, FL
63,732 Visits | 170 Posts | 512 Pix | 3 Videos
Mutton-Busting Nashville, TN
5,281 Visits | 127 Posts | 210 Pix | 0 Videos
sevenpeacksicf Clio, CA
40,412 Visits | 51 Posts | 326 Pix | 1 Videos
Gardner-Gate Price, UT
785 Visits | 1 Posts | 0 Pix | 0 Videos
Mahalo Logandale , AL
753 Visits | 1 Posts | 1 Pix | 0 Videos
Vilano-Beach--Water-... Saint Augustine, FL
24,951 Visits | 41 Posts | 119 Pix | 0 Videos
wumifoso
1,590 Visits | 1 Posts | 1 Pix | 0 Videos
insulation4us Wilmington, DE
1,488 Visits | 1 Posts | 4 Pix | 2 Videos
Insulationstop Latham, NY
1,494 Visits | 1 Posts | 1 Pix | 0 Videos
Our-Forever-House Omaha, NE
1,677 Visits | 2 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
35,821 Visits | 35 Posts | 140 Pix | 0 Videos
Homestead-II--Our-Ne... smithville, MO
1,593 Visits | 1 Posts | 0 Pix | 0 Videos
Larnerd-House Chenango Forks, NY
3,477 Visits | 2 Posts | 2 Pix | 0 Videos
HudsonHouse Omaha, NE
9,929 Visits | 4 Posts | 0 Pix | 0 Videos
Barrel-Race Houston, TX
11,067 Visits | 86 Posts | 175 Pix | 0 Videos
Cobbler-Mountain-Hom... Alexandria, VA
3,038 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

This site is exactly what I was looking for!!
Tino in Phoenix, AZ

Joe in Broken Arrow, OK's Journal Entries


Click here to create your own construction journal.

Posted by Joe in Broken Arrow, OK on 2/24/2008

Since my last post, we have completed roofing, rough wiring, plumbing top-out, structured-wiring rough, security-wire rough, and passed the multi-trade inspection. Insulation has been installed with sheetrock nearly complete. Exterior brick/rock is approximately half-completed. Cabinets have been measured and are being built. Granite paid for and on order. Interior/exterior doors have been measured and ordered. Met with trim carpenter and painter to relay game plan.

Expectations for this week include - finish sheetrock, finish exterior brick/rock, get permanent line for electric, and set meter so texturing can commence (need some heat). Attic insulation blown. Install garage doors and schedule flatwork.

Outlook beyond that - trim install in about 8-10 days. Painting to commence in 2.5 weeks.

Photos

Front elevation
Rear elevation



Login to Reply




Login to comment...
Copyright 1997-2016 Consensus Group Inc.