From $9.95



Syndication

Statistics

Users
Total: 27,983
Visited Last 30 days: 144
Forum Messages
Total: 20,563
Last 30 days: 7
Forum Evaluations
Total: 24,047
Last 30 days: 7
Journal Entries
Total: 4,869
Last 30 days: 11
Connections
Total: 14,983
Last 30 days: 6
Downloads
Total: 75,243

Journals

Name
The-Last-Rodeo Angel Fire, NM
13,904 Visits | 45 Posts | 18 Pix | 0 Videos
Tanglewood Colorado Springs, CO
103,333 Visits | 866 Posts | 2,317 Pix | 42 Videos
697-Marlin Austin/McDade, TX
4,204 Visits | 54 Posts | 424 Pix | 0 Videos
TheHoskensProject Dome-ville, central, FL
63,479 Visits | 170 Posts | 512 Pix | 3 Videos
Mutton-Busting Nashville, TN
4,883 Visits | 127 Posts | 210 Pix | 0 Videos
sevenpeacksicf Clio, CA
40,123 Visits | 51 Posts | 326 Pix | 1 Videos
Gardner-Gate Price, UT
637 Visits | 1 Posts | 0 Pix | 0 Videos
Mahalo Logandale , AL
625 Visits | 1 Posts | 1 Pix | 0 Videos
Vilano-Beach--Water-... Saint Augustine, FL
24,743 Visits | 41 Posts | 119 Pix | 0 Videos
wumifoso
1,385 Visits | 1 Posts | 1 Pix | 0 Videos
insulation4us Wilmington, DE
1,343 Visits | 1 Posts | 4 Pix | 2 Videos
Insulationstop Latham, NY
1,373 Visits | 1 Posts | 1 Pix | 0 Videos
Our-Forever-House Omaha, NE
1,545 Visits | 2 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
35,560 Visits | 35 Posts | 140 Pix | 0 Videos
Homestead-II--Our-Ne... smithville, MO
1,477 Visits | 1 Posts | 0 Pix | 0 Videos
Larnerd-House Chenango Forks, NY
3,357 Visits | 2 Posts | 2 Pix | 0 Videos
HudsonHouse Omaha, NE
9,780 Visits | 4 Posts | 0 Pix | 0 Videos
Barrel-Race Houston, TX
10,859 Visits | 86 Posts | 175 Pix | 0 Videos
Cobbler-Mountain-Hom... Alexandria, VA
2,895 Visits | 1 Posts | 0 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
47,296 Visits | 44 Posts | 191 Pix | 0 Videos
See all journals...

Current Top-Rated Posters


Your book and website have changed our thinking. Great stuff.
Jo Ann Honaker

Joe in Broken Arrow, OK's Journal Entries


Click here to create your own construction journal.

Posted by Joe in Broken Arrow, OK on 2/24/2008

Since my last post, we have completed roofing, rough wiring, plumbing top-out, structured-wiring rough, security-wire rough, and passed the multi-trade inspection. Insulation has been installed with sheetrock nearly complete. Exterior brick/rock is approximately half-completed. Cabinets have been measured and are being built. Granite paid for and on order. Interior/exterior doors have been measured and ordered. Met with trim carpenter and painter to relay game plan.

Expectations for this week include - finish sheetrock, finish exterior brick/rock, get permanent line for electric, and set meter so texturing can commence (need some heat). Attic insulation blown. Install garage doors and schedule flatwork.

Outlook beyond that - trim install in about 8-10 days. Painting to commence in 2.5 weeks.