From $9.95



Syndication

Statistics

Users
Total: 29,056
Visited Last 30 days: 119
Forum Messages
Total: 20,620
Last 30 days: 5
Forum Evaluations
Total: 24,139
Last 30 days: 0
Journal Entries
Total: 5,036
Last 30 days: 7
Connections
Total: 15,073
Last 30 days: 12
Downloads
Total: 77,469

Journals

Name
The-Last-Rodeo Angel Fire, NM
17,076 Visits | 156 Posts | 220 Pix | 3 Videos
697-Marlin Austin/McDade, TX
5,036 Visits | 63 Posts | 508 Pix | 0 Videos
Our-log-home Thomaston, GA
33 Visits | 1 Posts | 2 Pix | 0 Videos
gypsyhillfarm East Petersburg , PA
107 Visits | 2 Posts | 1 Pix | 0 Videos
skiddinginbroadside Livermore, AL
69 Visits | 1 Posts | 0 Pix | 0 Videos
thedaniels Graham, WA
175 Visits | 5 Posts | 5 Pix | 0 Videos
TheHoskensProject Dome-ville, FL
64,486 Visits | 172 Posts | 517 Pix | 3 Videos
Cabin-Addition--Spra... Austin, TX
129 Visits | 1 Posts | 5 Pix | 0 Videos
Tanglewood Colorado Springs, CO
107,293 Visits | 895 Posts | 2,362 Pix | 42 Videos
7th-and-last-Home-bu... Saratoga Springs, UT
421 Visits | 3 Posts | 10 Pix | 0 Videos
My-first-home
393 Visits | 1 Posts | 1 Pix | 0 Videos
Bruce Fowlerville, MI
341 Visits | 1 Posts | 0 Pix | 0 Videos
Sparky New Harmony, UT
351 Visits | 1 Posts | 1 Pix | 0 Videos
Mutton-Busting Nashville, TN
6,063 Visits | 127 Posts | 210 Pix | 0 Videos
sevenpeacksicf Clio, CA
41,092 Visits | 51 Posts | 326 Pix | 1 Videos
Gardner-Gate Price, UT
1,220 Visits | 1 Posts | 0 Pix | 0 Videos
Mahalo Logandale , AL
1,079 Visits | 1 Posts | 1 Pix | 0 Videos
Vilano-Beach--Water-... Saint Augustine, FL
25,650 Visits | 41 Posts | 119 Pix | 0 Videos
wumifoso
2,136 Visits | 1 Posts | 1 Pix | 0 Videos
insulation4us Wilmington, DE
1,868 Visits | 1 Posts | 4 Pix | 2 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

Thanks, and keep up the great work on the site!
Cara in Orlando, FL

Try one of our new Construction Bargain Strategies for free. Coupon code: CBS. One strategy could save you $1,000 or $10,000 or maybe $50,000 when you build or remodel.

Joe in Broken Arrow, OK's Journal Entries


Click here to create your own construction journal.

Posted by Joe in Broken Arrow, OK on 2/24/2008

Since my last post, we have completed roofing, rough wiring, plumbing top-out, structured-wiring rough, security-wire rough, and passed the multi-trade inspection. Insulation has been installed with sheetrock nearly complete. Exterior brick/rock is approximately half-completed. Cabinets have been measured and are being built. Granite paid for and on order. Interior/exterior doors have been measured and ordered. Met with trim carpenter and painter to relay game plan.

Expectations for this week include - finish sheetrock, finish exterior brick/rock, get permanent line for electric, and set meter so texturing can commence (need some heat). Attic insulation blown. Install garage doors and schedule flatwork.

Outlook beyond that - trim install in about 8-10 days. Painting to commence in 2.5 weeks.