From $9.95



Syndication






Statistics

Users
Total: 26,898
Visited Last 30 days: 93
Forum Messages
Total: 20,477
Last 30 days: 11
Forum Evaluations
Total: 24,014
Last 30 days: 2
Journal Entries
Total: 4,721
Last 30 days: 11
Connections
Total: 14,894
Last 30 days: 11
Downloads
Total: 72,598

Journals

Name
Mutton-Busting Nashville, TN
2,392 Visits | 66 Posts | 108 Pix | 0 Videos
TheHoskensProject Dome-ville, central, FL
61,592 Visits | 161 Posts | 481 Pix | 3 Videos
The-Last-Rodeo Angel Fire, NM
12,104 Visits | 30 Posts | 10 Pix | 0 Videos
Vilano-Beach--Water-... Saint Augustine, FL
23,359 Visits | 40 Posts | 118 Pix | 0 Videos
Tanglewood Colorado Springs, CO
97,492 Visits | 823 Posts | 2,272 Pix | 42 Videos
wumifoso
284 Visits | 1 Posts | 1 Pix | 0 Videos
insulation4us Wilmington, DE
280 Visits | 1 Posts | 4 Pix | 2 Videos
697-Marlin-Near-Aust... Austin/McDade, TX
2,856 Visits | 39 Posts | 262 Pix | 0 Videos
eModernDecor South El Monte, CA
389 Visits | 1 Posts | 5 Pix | 4 Videos
Insulationstop Latham, NY
312 Visits | 1 Posts | 1 Pix | 0 Videos
Our-Forever-House Omaha, NE
527 Visits | 2 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
33,876 Visits | 35 Posts | 140 Pix | 0 Videos
Homestead-II--Our-Ne... smithville, MO
482 Visits | 1 Posts | 0 Pix | 0 Videos
Larnerd-House Chenango Forks, NY
2,367 Visits | 2 Posts | 2 Pix | 0 Videos
HudsonHouse Omaha, NE
8,664 Visits | 4 Posts | 0 Pix | 0 Videos
Seven-Peaks-Faswall-... Graeagle, CA
38,364 Visits | 50 Posts | 320 Pix | 1 Videos
Barrel-Race Houston, TX
9,435 Visits | 86 Posts | 175 Pix | 0 Videos
Cobbler-Mountain-Hom... Alexandria, VA
1,825 Visits | 1 Posts | 0 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
45,852 Visits | 44 Posts | 191 Pix | 0 Videos
Bladenkirk White Oak, NC
1,945 Visits | 6 Posts | 4 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

I was going to sell all the books Mark and Elaine sold to me, but they are too dog-eared and marked up :) Good resources!
Jim in Fairview, UT



Posted by Joe in Broken Arrow, OK on 2/24/2008

Since my last post, we have completed roofing, rough wiring, plumbing top-out, structured-wiring rough, security-wire rough, and passed the multi-trade inspection. Insulation has been installed with sheetrock nearly complete. Exterior brick/rock is approximately half-completed. Cabinets have been measured and are being built. Granite paid for and on order. Interior/exterior doors have been measured and ordered. Met with trim carpenter and painter to relay game plan.

Expectations for this week include - finish sheetrock, finish exterior brick/rock, get permanent line for electric, and set meter so texturing can commence (need some heat). Attic insulation blown. Install garage doors and schedule flatwork.

Outlook beyond that - trim install in about 8-10 days. Painting to commence in 2.5 weeks.