From $9.95



Syndication

Statistics

Users
Total: 28,321
Visited Last 30 days: 139
Forum Messages
Total: 20,590
Last 30 days: 10
Forum Evaluations
Total: 24,093
Last 30 days: 17
Journal Entries
Total: 4,941
Last 30 days: 14
Connections
Total: 15,010
Last 30 days: 12
Downloads
Total: 76,095

Journals

Name
The-Last-Rodeo Angel Fire, NM
14,866 Visits | 89 Posts | 95 Pix | 2 Videos
My-first-home
5 Visits | 1 Posts | 1 Pix | 0 Videos
7th-and-last-Home-bu... Saratoga Springs, UT
15 Visits | 1 Posts | 6 Pix | 0 Videos
Tanglewood Colorado Springs, CO
104,846 Visits | 882 Posts | 2,342 Pix | 42 Videos
Bruce Fowlerville, MI
29 Visits | 1 Posts | 0 Pix | 0 Videos
697-Marlin Austin/McDade, TX
4,489 Visits | 62 Posts | 508 Pix | 0 Videos
Sparky New Harmony, UT
56 Visits | 1 Posts | 1 Pix | 0 Videos
TheHoskensProject Dome-ville, central, FL
63,805 Visits | 170 Posts | 512 Pix | 3 Videos
Mutton-Busting Nashville, TN
5,359 Visits | 127 Posts | 210 Pix | 0 Videos
sevenpeacksicf Clio, CA
40,474 Visits | 51 Posts | 326 Pix | 1 Videos
Gardner-Gate Price, UT
826 Visits | 1 Posts | 0 Pix | 0 Videos
Mahalo Logandale , AL
786 Visits | 1 Posts | 1 Pix | 0 Videos
Vilano-Beach--Water-... Saint Augustine, FL
25,012 Visits | 41 Posts | 119 Pix | 0 Videos
wumifoso
1,652 Visits | 1 Posts | 1 Pix | 0 Videos
insulation4us Wilmington, DE
1,523 Visits | 1 Posts | 4 Pix | 2 Videos
Insulationstop Latham, NY
1,529 Visits | 1 Posts | 1 Pix | 0 Videos
Our-Forever-House Omaha, NE
1,712 Visits | 2 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
35,896 Visits | 35 Posts | 140 Pix | 0 Videos
Homestead-II--Our-Ne... smithville, MO
1,623 Visits | 1 Posts | 0 Pix | 0 Videos
Larnerd-House Chenango Forks, NY
3,507 Visits | 2 Posts | 2 Pix | 0 Videos
See all journals...

I have learned a lot from your site, it's great!
John B., Las Cruces, NM

Joe in Broken Arrow, OK's Journal Entries


Click here to create your own construction journal.

Posted by Joe in Broken Arrow, OK on 2/24/2008

Since my last post, we have completed roofing, rough wiring, plumbing top-out, structured-wiring rough, security-wire rough, and passed the multi-trade inspection. Insulation has been installed with sheetrock nearly complete. Exterior brick/rock is approximately half-completed. Cabinets have been measured and are being built. Granite paid for and on order. Interior/exterior doors have been measured and ordered. Met with trim carpenter and painter to relay game plan.

Expectations for this week include - finish sheetrock, finish exterior brick/rock, get permanent line for electric, and set meter so texturing can commence (need some heat). Attic insulation blown. Install garage doors and schedule flatwork.

Outlook beyond that - trim install in about 8-10 days. Painting to commence in 2.5 weeks.

Photos

Front elevation
Rear elevation