From $9.95



Syndication






Statistics

Users
Total: 26,840
Visited Last 30 days: 87
Forum Messages
Total: 20,471
Last 30 days: 5
Forum Evaluations
Total: 24,012
Last 30 days: 0
Journal Entries
Total: 4,712
Last 30 days: 9
Connections
Total: 14,883
Last 30 days: 11
Downloads
Total: 72,468

Journals

Name
Tanglewood Colorado Springs, CO
96,824 Visits | 821 Posts | 2,272 Pix | 42 Videos
Mutton-Busting Nashville, TN
2,103 Visits | 61 Posts | 98 Pix | 0 Videos
TheHoskensProject Dome-ville, central, FL
61,326 Visits | 160 Posts | 478 Pix | 3 Videos
wumifoso
94 Visits | 1 Posts | 1 Pix | 0 Videos
insulation4us Wilmington, DE
115 Visits | 1 Posts | 4 Pix | 2 Videos
insulation4less Folkestone, AL
134 Visits | 1 Posts | 3 Pix | 0 Videos
697-Marlin-Near-Aust... Austin/McDade, TX
2,645 Visits | 39 Posts | 262 Pix | 0 Videos
eModernDecor South El Monte, CA
206 Visits | 1 Posts | 5 Pix | 4 Videos
Insulationstop Latham, NY
154 Visits | 1 Posts | 1 Pix | 0 Videos
Our-Forever-House Omaha, NE
363 Visits | 2 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
33,576 Visits | 35 Posts | 140 Pix | 0 Videos
Homestead-II--Our-Ne... smithville, MO
330 Visits | 1 Posts | 0 Pix | 0 Videos
The-Last-Rodeo Angel Fire, NM
11,786 Visits | 29 Posts | 10 Pix | 0 Videos
Larnerd-House Chenango Forks, NY
2,211 Visits | 2 Posts | 2 Pix | 0 Videos
HudsonHouse Omaha, NE
8,486 Visits | 4 Posts | 0 Pix | 0 Videos
Seven-Peaks-Faswall-... Graeagle, CA
38,050 Visits | 50 Posts | 320 Pix | 1 Videos
Barrel-Race Houston, TX
9,229 Visits | 86 Posts | 175 Pix | 0 Videos
Cobbler-Mountain-Hom... Alexandria, VA
1,632 Visits | 1 Posts | 0 Pix | 0 Videos
Vilano-Beach--Water-... Saint Augustine, FL
23,160 Visits | 39 Posts | 118 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
45,633 Visits | 44 Posts | 191 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts

Hi. I am new here and SO happy to have found this site! I am very new to this owner-builder circle/just beginning.
Karen in Kingston, NH



Posted by Joe in Broken Arrow, OK on 2/24/2008

Since my last post, we have completed roofing, rough wiring, plumbing top-out, structured-wiring rough, security-wire rough, and passed the multi-trade inspection. Insulation has been installed with sheetrock nearly complete. Exterior brick/rock is approximately half-completed. Cabinets have been measured and are being built. Granite paid for and on order. Interior/exterior doors have been measured and ordered. Met with trim carpenter and painter to relay game plan.

Expectations for this week include - finish sheetrock, finish exterior brick/rock, get permanent line for electric, and set meter so texturing can commence (need some heat). Attic insulation blown. Install garage doors and schedule flatwork.

Outlook beyond that - trim install in about 8-10 days. Painting to commence in 2.5 weeks.

Photos

Front elevation
Rear elevation



Login to Reply




Login to comment...
Copyright 1997-2015 Consensus Group Inc.