From $9.95



Syndication

Statistics

Users
Total: 28,321
Visited Last 30 days: 142
Forum Messages
Total: 20,590
Last 30 days: 11
Forum Evaluations
Total: 24,093
Last 30 days: 17
Journal Entries
Total: 4,941
Last 30 days: 15
Connections
Total: 15,008
Last 30 days: 10
Downloads
Total: 76,095

Journals

Name
The-Last-Rodeo Angel Fire, NM
14,843 Visits | 89 Posts | 95 Pix | 2 Videos
My-first-home
4 Visits | 1 Posts | 1 Pix | 0 Videos
7th-and-last-Home-bu... Saratoga Springs, UT
13 Visits | 1 Posts | 6 Pix | 0 Videos
Tanglewood Colorado Springs, CO
104,834 Visits | 882 Posts | 2,342 Pix | 42 Videos
Bruce Fowlerville, MI
28 Visits | 1 Posts | 0 Pix | 0 Videos
697-Marlin Austin/McDade, TX
4,486 Visits | 62 Posts | 508 Pix | 0 Videos
Sparky New Harmony, UT
56 Visits | 1 Posts | 1 Pix | 0 Videos
TheHoskensProject Dome-ville, central, FL
63,801 Visits | 170 Posts | 512 Pix | 3 Videos
Mutton-Busting Nashville, TN
5,358 Visits | 127 Posts | 210 Pix | 0 Videos
sevenpeacksicf Clio, CA
40,471 Visits | 51 Posts | 326 Pix | 1 Videos
Gardner-Gate Price, UT
826 Visits | 1 Posts | 0 Pix | 0 Videos
Mahalo Logandale , AL
786 Visits | 1 Posts | 1 Pix | 0 Videos
Vilano-Beach--Water-... Saint Augustine, FL
25,009 Visits | 41 Posts | 119 Pix | 0 Videos
wumifoso
1,651 Visits | 1 Posts | 1 Pix | 0 Videos
insulation4us Wilmington, DE
1,522 Visits | 1 Posts | 4 Pix | 2 Videos
Insulationstop Latham, NY
1,529 Visits | 1 Posts | 1 Pix | 0 Videos
Our-Forever-House Omaha, NE
1,710 Visits | 2 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
35,895 Visits | 35 Posts | 140 Pix | 0 Videos
Homestead-II--Our-Ne... smithville, MO
1,623 Visits | 1 Posts | 0 Pix | 0 Videos
Larnerd-House Chenango Forks, NY
3,506 Visits | 2 Posts | 2 Pix | 0 Videos
See all journals...

I'm new to this site and have just purchased the lot I plan to build on. So far, this is a terrific resource. I hope I'll be able to contribute as time goes on.
Robert in Paradise Valley, AZ

Joe in Broken Arrow, OK's Journal Entries


Click here to create your own construction journal.

Posted by Joe in Broken Arrow, OK on 1/9/2008

Framing commenced last week and has gone pretty smoothly thus far. Since I have no prior experience building a home, and thus no real familiarity with this process, I can't make a comparison. Nevertheless, I would put this crew up against any other. They work non-stop except for a brief lunch break. The lead framer and owner of the company is terrific. While laying out the lines for the first-floor framing, he detected several errors with the squareness of the slab and a distance error on the long run dimension. He was able to make up for these errors, but made great strides in making sure that the finished product was not jeopardized in the process. Whenever a change is considered or a necessary correction, he thinks all the way through the trim stage to make sure it will look right (quality end result). As of this journal entry they are finishing up installing the ceiling joists on the second floor and installing rafters. By the end of the week, hope to be decked with roofing likely to start first of next week. Plumbers and electricians are next on deck and ready for top-out. Progress pics provided.

Photos

Rear elevation looking east/northeast
Front elevation looking west/southwest
Left elevation looking north/northwest



Login to Reply




Login to comment...
Copyright 1997-2016 Consensus Group Inc.