From $9.95



Syndication

Statistics

Users
Total: 27,993
Visited Last 30 days: 148
Forum Messages
Total: 20,565
Last 30 days: 9
Forum Evaluations
Total: 24,047
Last 30 days: 7
Journal Entries
Total: 4,871
Last 30 days: 11
Connections
Total: 14,985
Last 30 days: 8
Downloads
Total: 75,295

Journals

Name
The-Last-Rodeo Angel Fire, NM
13,919 Visits | 46 Posts | 21 Pix | 0 Videos
Tanglewood Colorado Springs, CO
103,376 Visits | 867 Posts | 2,317 Pix | 42 Videos
697-Marlin Austin/McDade, TX
4,214 Visits | 54 Posts | 424 Pix | 0 Videos
TheHoskensProject Dome-ville, central, FL
63,490 Visits | 170 Posts | 512 Pix | 3 Videos
Mutton-Busting Nashville, TN
4,899 Visits | 127 Posts | 210 Pix | 0 Videos
sevenpeacksicf Clio, CA
40,134 Visits | 51 Posts | 326 Pix | 1 Videos
Gardner-Gate Price, UT
643 Visits | 1 Posts | 0 Pix | 0 Videos
Mahalo Logandale , AL
629 Visits | 1 Posts | 1 Pix | 0 Videos
Vilano-Beach--Water-... Saint Augustine, FL
24,751 Visits | 41 Posts | 119 Pix | 0 Videos
wumifoso
1,392 Visits | 1 Posts | 1 Pix | 0 Videos
insulation4us Wilmington, DE
1,349 Visits | 1 Posts | 4 Pix | 2 Videos
Insulationstop Latham, NY
1,377 Visits | 1 Posts | 1 Pix | 0 Videos
Our-Forever-House Omaha, NE
1,550 Visits | 2 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
35,568 Visits | 35 Posts | 140 Pix | 0 Videos
Homestead-II--Our-Ne... smithville, MO
1,481 Visits | 1 Posts | 0 Pix | 0 Videos
Larnerd-House Chenango Forks, NY
3,362 Visits | 2 Posts | 2 Pix | 0 Videos
HudsonHouse Omaha, NE
9,785 Visits | 4 Posts | 0 Pix | 0 Videos
Barrel-Race Houston, TX
10,864 Visits | 86 Posts | 175 Pix | 0 Videos
Cobbler-Mountain-Hom... Alexandria, VA
2,901 Visits | 1 Posts | 0 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
47,306 Visits | 44 Posts | 191 Pix | 0 Videos
See all journals...

Current Top-Rated Posters


What a great site this is!
Nancy from Ohio

Joe in Broken Arrow, OK's Journal Entries


Click here to create your own construction journal.

Posted by Joe in Broken Arrow, OK on 11/18/2007

On 11/16/07 we trenched roughly 500' in order to get power down to site. The majority of the 4' deep 18" wide trench went well... with the exception of a 20 to 30-foot section where the sandstone was just too hard to dig. There we were only able to get to a depth of 3'. Water meter and temporary electrical pole have been set. Power company thinks they can get the lines in trench and transformer set early next week. A few pics are included.

Photos




Login to Reply




Login to comment...
Copyright 1997-2016 Consensus Group Inc.