We decided Monday that we should put the septic in this week. It's about a month before we need it, but the weather is dry and warm so I'd like to get it off the list. The septic field was supposed to be a 9' cut but turned out to need 13' to reach sand. They did the excavating on Tuesday, put in the septic tanks today, and will bring sand in tomorrow and build the field. We are also beginning to work in final grading around the house.
The roof is going up tomorrow. We decided to add two skylights for $202 each (plus another 150 each for installation by the roofer).
This weekend I will start on the inside electrical, lighting, central vac, intercom, and data wiring.
Brian