From $9.95



Syndication






Statistics

Users
Total: 26,946
Visited Last 30 days: 80
Forum Messages
Total: 20,497
Last 30 days: 21
Forum Evaluations
Total: 24,017
Last 30 days: 3
Journal Entries
Total: 4,733
Last 30 days: 13
Connections
Total: 14,902
Last 30 days: 8
Downloads
Total: 72,757

Journals

Name
Tanglewood Colorado Springs, CO
98,283 Visits | 826 Posts | 2,284 Pix | 42 Videos
Mutton-Busting Nashville, TN
2,751 Visits | 74 Posts | 121 Pix | 0 Videos
TheHoskensProject Dome-ville, central, FL
61,915 Visits | 163 Posts | 489 Pix | 3 Videos
The-Last-Rodeo Angel Fire, NM
12,577 Visits | 30 Posts | 10 Pix | 0 Videos
Vilano-Beach--Water-... Saint Augustine, FL
23,614 Visits | 40 Posts | 118 Pix | 0 Videos
wumifoso
505 Visits | 1 Posts | 1 Pix | 0 Videos
insulation4us Wilmington, DE
506 Visits | 1 Posts | 4 Pix | 2 Videos
697-Marlin-Near-Aust... Austin/McDade, TX
3,104 Visits | 39 Posts | 262 Pix | 0 Videos
Insulationstop Latham, NY
529 Visits | 1 Posts | 1 Pix | 0 Videos
Our-Forever-House Omaha, NE
754 Visits | 2 Posts | 0 Pix | 0 Videos
NorthPoleHome North Pole, AK
34,167 Visits | 35 Posts | 140 Pix | 0 Videos
Homestead-II--Our-Ne... smithville, MO
687 Visits | 1 Posts | 0 Pix | 0 Videos
Larnerd-House Chenango Forks, NY
2,568 Visits | 2 Posts | 2 Pix | 0 Videos
HudsonHouse Omaha, NE
8,903 Visits | 4 Posts | 0 Pix | 0 Videos
Seven-Peaks-Faswall-... Graeagle, CA
38,654 Visits | 50 Posts | 320 Pix | 1 Videos
Barrel-Race Houston, TX
9,698 Visits | 86 Posts | 175 Pix | 0 Videos
Cobbler-Mountain-Hom... Alexandria, VA
2,049 Visits | 1 Posts | 0 Pix | 0 Videos
1860s-Texas-rehabnew... Boerne, TX
46,101 Visits | 44 Posts | 191 Pix | 0 Videos
Bladenkirk White Oak, NC
2,154 Visits | 6 Posts | 4 Pix | 0 Videos
P-Wade-Crocker Spring, TX
1,900 Visits | 1 Posts | 0 Pix | 0 Videos
See all journals...

Current Top-Rated Posters

RatingPosts
sue in el paso, TX0.001

I have just finished The Owner-Builder Book. Very good read. It inspired what I already felt like I could do.
Mary Beth in Dublin, OH



Posted by Brian in Dexter, MI on 8/15/2007

Since the last update, the stone and tile drains have been installed on the exterior, the radiant passed the pressure test, we passed the subsoil inspection, the slab has been poured, deck footings have been dug, we passed the backfill inspection, and the second-floor ICF stacking has begun. We plan to backfill tomorrow, pour Friday, and frame next week. All of the framing is panelized, so we will jump to dry-in really fast.

Photos



My Construction Website


Login to Reply




Login to comment...
Copyright 1997-2015 Consensus Group Inc.