| METER READING |
DAYS IN BILLING |
KWH |
| DATE |
CYCLE |
USAGE |
| 8-Sep-09 |
33 |
3600 |
| 6-Aug-09 |
28 |
3008 |
| 9-Jul-09 |
31 |
3546 |
| 8-Jun-09 |
32 |
2384 |
| 7-May-09 |
30 |
1544 |
| 7-Apr-09 |
28 |
1177 |
| 10-Mar-09 |
29 |
1295 |
| 9-Feb-09 |
31 |
1329 |
| 9-Jan-09 |
31 |
1560 |
| 9-Dec-08 |
32 |
1427 |
| 7-Nov-08 |
30 |
1507 |
| 8-Oct-08 |
29 |
2100 |
| 9-Sep-08 |
33 |
3058 |
Electric Usage over last 12 months.
Comments (4)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 8/22/2008 12:07:53 PM
Here are a few shots of the finished exterior. (Well, mostly finished but I won't point out what still needs to be done.)
Photos
Comments (0)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 8/20/2008 10:01:45 AM
Energy Wise Structures helped us correctly size our HVAC for our closed-envelope structure. They can be found at: energywisestructures. Contact them while designing your house. They will help with suggestions about wall material, HVAC, etc. When you have your complete floor plan, they will size your HVAC and tell you how much your heating and cooling costs will be per month. They also give you a cost comparison on how much savings you will have versus traditional building materials.
For example, our house with bonus room would be 5,500 sf. Most AC guys would size that @10-12 tons of AC. We are very comfortable with two units at 6.5 tons. All our ductwork was sized by the Energywise folks, so our AC guy just had to install what they recommended. Our heating/cooling has been below the $190/month that the Energywise people stated. That amount however does not cover other electrical loads such as lighting, appliances, etc... just HVAC!
Comments (1)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 6/2/2008 9:55:13 PM
Knifong Environmental Design duties performed: Overall Site, landscape, and irrigation design 682-478-6627
Comments (0)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 4/9/2008 9:08:22 AM
| Work/Supplies |
Company |
Name |
Phone |
| A/C |
Goowin A/C |
Jim |
817-938-3477 |
| Cabinets |
Olin Piper Cust Cabinets |
Olin Piper |
817-489-2029 |
| Culture Marble Countertops |
Nor-Tex Kitchen & Bath |
|
940-320-8815 |
| Dirt work |
Duty Dirt |
Rodger Bridges |
940-627-4516 |
| Doors/Windows |
Nix Door and Window |
Brian Sooter |
817-920-9221 |
| Electrical |
Cornerstone Elec. Services |
John |
682-438-7060 |
| Finish Work/Trim |
Grey Brothers Trim |
Earl Grey |
940-391-3042 |
| Fireplaces |
Fort Worth Door |
Ray |
817-925-3720 |
| Flooring |
Creation Carpet |
Richard Courchesne |
682.553.3274 |
| Foundation Engineering and soil testing |
Whitworth Engineering |
|
817-236-6106 |
| Foundation/Driveway |
Lampman Concrete |
Bill Lampman |
817-980-8050 |
| Framing |
Rodway |
Rod Woody |
817-925-4927 |
| Garage Doors |
Family Christian Doors |
Brandon |
817-903-8084 |
| Granite Countertops |
Century Granite and Marble |
|
817-329-9499 |
| ICF Installers |
ICF Constructors |
Matt |
832-264-6282 |
| Landscaping |
|
Toby |
817-692-2029 |
| Lumber |
Fort Worth Lumber |
Tom |
817-994-4079 |
| Metal Roof Supplies |
Mueller metal Buil and Roofs |
Chad |
817-441-1120 |
| Mirrors |
Fashion Glass |
|
817-232-3421 |
| Open Cell Foam Insulation |
Korbin Foam |
Jim |
817-793-3529 |
| Septic System |
Aero Valley Septic |
Brandon |
817-491-9142 |
| Stairs |
Trinity Stairs |
|
972-335-0700 |
| Stonework labor only |
|
Miguel |
817-726-8214 |
| Tile Work |
Shannon Tile |
Chad Shannon |
817-891-3342 |
Filesrecommended_contractors.pdf
Comments (1)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 8/7/2007
Our irrigation system and landscaping are in. The irrigation system is called KISSS (www.kisssusa.com). It is a capillary system that waters at the roots instead of on top of the plants and only uses 20% of the water used by a traditional system.
Photos
Comments (2)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 6/27/2007
Tiling is almost complete, there is still a little bit of tile to be installed and then some sealing to be done. Hopefully that will wrap up by next week. The hardwood floors are being stained and finished this week, so there's not too much activity to prevent dust from being kicked up. Most of the fixtures are in, too. The wood ceiling has also been finished. It sure seems like the home stretch takes forever, but I think we're starting to see the light at the end of the tunnel... or is that just a can light?
Photos
Comments (2)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 6/5/2007
Well, the painters thought they'd be done last weekend but it's taking a little longer. We do have a lot of different colors, patterns, and things though. Can you tell which room belongs the the three-year old little girl? :0) Most of the first floor doors and windows are still taped up, so some of the pictures are pretty dark. The bathroom vanity countertops are in, and the kitchen countertops are being installed right now.
Photos
Comments (0)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 6/1/2007
We finally finished the ceiling and the permanent doors are in. The painters will be finishing up this weekend. At the end of our project, we will post a list of all the subs we recommend as well as other resources. Please check back regularly.
Photos
Comments (3)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 5/17/2007
So far there have only been two of us installing the ceiling, so it's been a little slow. Today we have plenty of help though, so we should be wrapping it up in no time.
Photos
Comments (0)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 5/11/2007
The trim carpenters are well underway. Much of the trim is up and the closets are done. We're still waiting on some of the trim and doors which has slowed progress, but hopefully that will be resolved soon. The hardwood floors are finally done too.
Photos
Comments (0)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 4/29/2007
The last kitchen cabinet is in and most of the cabinet trim is complete. We've started the hardwood floors. We're making progress but it is SLOW. This is the biggest job that we've undertaken ourselves, but it's worth it. They look really nice.
Photos
Comments (0)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 4/25/2007
The kitchen cabinets were installed this week. There is still a little trim work and one cabinet still to come. Our cabinet makers have been great. We had some very specific ideas for our cabinets and they had no problems accommodating. We're really pleased!
Photos
Comments (0)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 4/23/2007
I finally remembered to take my camera when there was enough light to get some decent pictures of the shower surrounds. The last of the cabinetry was delivered today --installation begins tommorrow. Hardwood floor installation has also begun. Trim carpenters will start as soon as the trim arrives. It's all coming together!
Photos
Comments (1)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 4/16/2007
The stairs and tub/shower surrounds are done. It was too dark to get pictures of all of them, so there will be more to follow. Today more cabinetry went in -- the entertainment center, master bath, and some of the master closet. The kitchen should be done soon, and that will finish up the cabinetry.
Photos
Comments (4)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 4/8/2007
The chimney is almost done. At this point the exterior is almost complete -- we still lack shutters, permanent doors and a few areas still need metal roof.
Photos
Comments (0)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 4/6/2007
Drywall and texture have been completed. Currently the masons are working on the exterior. (More exterior pictures to follow.) And the cabinetmaker has started installing cabinetry.
Photos
Comments (0)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 3/20/2007
Here are some shots of the inside of the house framing and the Demalac foam as it is being installed on the underside of the roof decking.
Photos
Comments (0)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 1/25/2007
The roofers have been drying-in the house and now the HVAC, electricians, and plumbers are going to work.
Photos
Comments (1)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 1/10/2007
Well it has been a long time since we have made an entry... the framers are finished.
Photos
Comments (2)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 12/9/2006
Pictures from the day we poured concrete into the ICF forms.
Photos
Comments (2)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 12/8/2006
The guys from ICF Constructors made quick work of the ICF walls. They started on Monday at 10:30 and finished pouring Thursday night.
Photos
Comments (0)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 12/5/2006
Our ICF blocks came in last Saturday. Matt and his ICF Constructors crew got here Monday morning from Houston and started popping chaulk lines. Once that was complete, they glued the first two rows of blocks down while one of his guys and I made window and door bucks. Unfortunately, the rebar did not show up today so tomorrow they will insert the rebar and start moving up to the 10' height.
Comments (0)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 11/30/2006
The plumbers and electrician got the stuff in the pad quickly. We got our pad poured, 174 yards, right before the big freeze hit the Dallas/Fort Worth area. The guy with the white shirt and his hands up is my buddy Mike, who is our GC.
Photos
Comments (0)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 11/16/2006
Lampman Concrete got the form boards up and are drilling the piers.
Photos
Comments (1)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 11/9/2006
Rodger and the Duty Dirt crew is here tearing our place up.
Photos
Comments (0)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 11/9/2006
Well the septic system is in and tied to the old house.
Photos
Comments (0)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 11/1/2006
We have the go from the city to pull our permits after their review. Septic guy, Brandon, should be starting any day now while the dirt work begins also. We will be digging a pond at the low point in our property to get enough dirt to build the pad.
Comments (2)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 10/22/2006
We have filed our permit application with the city and the construction loan is being appraised. The cooperative did show up and put some new poles in for the new house. It's our unofficial groundbreaking!
Photos
Comments (5)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 10/9/2006
Well, we are getting close to the big day. Our platting has been filed and the grading plan finished. We just need to get some final bids for the dirt work, get the bank approval and we are pulling permits! I guess it's time to do some negotiating with subs and get the bottom line down!
Comments (0)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 9/9/2006
We have completed our survey work and now the property is going to the city for platting. The grading engineer will be getting the cad file from the surveyor, so he will begin the grading and drainage report required by our city. I have attached the elevations to the journal.
Photos
Comments (2)
Send Private Message
Posted to ICF-Keller-Tx by Eric in Roanoke, TX
on 8/27/2006
We started our building journal.
Comments (2)
Send Private Message
|
|
| Who's Online | | In The Last 20 Minutes | | RogerC in Phoenix, AZ | | Glenn in Ocoee, FL | | Lisa in Cave Creek, AZ | | More Than 20 Minutes Ago | | Dionne in Omaha, NE | | Scott in Richmond, VA | | Mark in APO, AE | | Tim in Anchorage, AK | | Adam | | Rich in Suffolk, VA | | jun in ko, UT | | P in North, FL | | Brian in Dome-ville, central, FL | | Katie in Mill Creek, WA | | Bryan in Scottsdale, AZ | | Mary in Lititz, PA | | Michael in Cave Creek, AZ | | Trisha in Weatherford, TX | | Daniel in Richmond, VA | | Maynard in Rivera, CA | | mark in altoona, PA | | Mancong in Seattle, WA | | Keith in Jeffersonville, GA | | Jennifer in San Mateo, CA | | Mark in Bell, FL | | Faye in Marseilles, IL | | kemi in orlando, FL | | Mark in Seattle, WA |
| Top Forum Evaluators | | Mark in Provo, UT(7,903) | | Paul in Provo, UT(3,832) | | P in North, FL(1,492) | | David in Fredericksburg, VA(1,458) | | Lauren A. in Springville, UT(1,149) | | Rich in Suffolk, VA(816) | | Dale in Richland, AZ(807) | | Grant in Jacksonville, AL(643) | | Steven in Colorado Springs, CO(500) | | Bob in Philadelphia, PA(427) | | Kirsten in Atascadero, CA(301) | | George in wharton, TX(257) | | Lori in Reno, NV(213) | | Kenneth in Lees Summit, MO(200) | | Michael Penn in Dripping Springs, TX(184) | | Chris in Schertz, TX(115) | | Toi in Alachua County, FL(86) | | Mary in Lititz, PA(52) | | Justin in Chandler, AZ(52) | | Danny in Sparta, IL(47) |
|