Syndication






Statistics
Users
  Total:24,129
  Visited Last 30 days:388
Forum Messages
  Total:19,664
  Last 30 days:174
Forum Evaluations
  Total:22,017
  Last 30 days:1,054
Journal Entries
  Total:3,228
  Last 30 days:51
Connections
  Total:13,392
  Last 30 days:568
Downloads
  Total:55,454
Journals
Name Visits Posts Pics Videos

LittleLakeCorner42,4731016040
9/29/2009Groveland, FL

ICF-Keller-Tx32,747321220
10/6/2009Roanoke, TX

Bobs-Blog32,162614140
9/16/2009New Florence, PA

TheHoskensProject28,307761711
SundayDome-ville, central, FL

toolehouse27,238891450
9/20/2009Reno, NV

octagonaltopsider24,3978120
8/17/2009Cupertino, CA

OwensNewHome23,6101013810
8/29/2009Chandler, AZ

Working-Wilton20,358332970
9/8/2009Wilton, NH

Homestead18,09463850
6/12/2009Smithville, MO

1860s-Texas-Rehab-Ne...16,988411850
11/13/2009Boerne, TX

tanglewood16,09727060221
3/5/2010Colorado Springs, CO

PennsmithLostValleyT...15,724552150
9/9/2009Dripping Springs, TX

DreamHome14,958261900
6/7/2009Orlando, FL

Beaver-Creek-Ranch11,310111580
2/26/2010Santa Rosa, CA

ICF-in-Ann-Arbor11,157293710
1/25/2010Dexter, MI

Dennis-Dream-Home10,255385050
8/27/2009Readington Twp, NJ

Arkansas-First-Timer9,63239880
3/27/2009Trumann, AR

AirparkHome-Remodel9,49221410
9/15/2009Hillsboro, OR

Seven-Peaks-Faswall-...8,752342520
11/9/2009Graeagle, CA

CastleHeims7,04721590
6/5/2009cedar rapids, IA

Victor--Susan-086,444211210
3/17/2009Ruckersville, VA

Plant-City-Craftsman5,6294100
11/22/2009Plant City, FL

The-Cortes-Adventure5,306320
6/13/2009Snowflake, AZ

Naperville-Webster-S...4,8342250
6/1/2009Naperville, IL

PahrumpProject4,3755390
1/17/2010Spokane, WA

3024,2329290
11/28/2009Belfair, WA

SouthernEcoHome4,18219210
8/4/2009Jacksonville, AL

Schrammelot3,8947900
9/11/2009Pierson, FL

steve-n-carolyn3,7863130
4/29/2009Sun City, CA

threegables3,776201340
9/29/2009Hartland, WI

Artist-Haven-Home3,569961
1/13/2010Kansas City, MO

Arnold-CA-Alpine-cha...3,41216100
ThursdayArnold, CA

Eschete-Dome3,31511220
1/20/2010Lafayette, LA

Workshop3,271520
6/13/2009Florissant, CO

Castle-Rock-Lakehous...3,15410840
4/27/2009Necedah, WI

SOPHIA--SAMUELDELAWA...2,74011310
12/2/2009Smyrna, DE

TheBeachHouse2,47813200
1/16/2010Shoreline, WA

RR-Homestead2,37630740
2/1/2010Janesville, CA

YaNYca2,256400
2/17/2010Boston, MA

NorthPoleHome2,159490
2/12/2010Anchorage, AK

Back-Home-In-Crisp2,156111510
3/22/2009Ennis, TX

Backwoods-Project2,097390
3/4/2010Jeffersonville, GA

TheHouse2322,092470
9/18/2009Bronx, NY

High-over-Lake-Granb...2,07011210
1/5/2010Granbury, TX

Small-Timber-Frame2,041110
4/2/2009Central Mass, MA

Where-to-start1,934610
5/16/2009Lemoore, CA

DomeSweetDome1,910420
ThursdaySuffolk, VA

Oleg1,413360
4/22/2009San Diego, CA

OurFarmstead1,36020260
WednesdayLititz, PA

Sherman1,33315990
2/6/2010Downers Grove, IL

Shane1,317600
10/31/2009San Antonio, TX

EatonLoch-Haven1,195110
4/1/2009Roanoke, VA

Rick-and-Tinas-dream...1,160120
3/14/2009Auburndale, FL

Huckleberry-Home1,116200
4/8/2009Williamstown, NJ

MoeCompound1,081340
4/9/2009Camano Island, WA

windowsnsiding1,073110
3/28/2009Long Island, NY

Hidden-Meadow-Home1,004160
5/20/2009Murrieta, CA

Steinys-Hideaway992200
6/9/2009venice, CA

Vonk966100
4/7/2009Zeeland, MI

Southport-NC-Home954191231
MondaySouthport, NC

Massive-Undertaking9231100
8/26/2009Wimauma, FL

Cheriki-Organic-Farm9221370
3/4/2010Ft. Collins, CO

Utah-Warehouse909220
5/20/2009Fairview, UT

ADCountryHome9071130
10/31/2009Fort Worth, TX

PensacolaBeachHouse880110
6/22/2009Gulf Breeze, FL

The-New-Ries-Homeste...85316771
ThursdayPolk/Richfield/Erin/Hartford, WI

12YEARSINTHEPLANNING850120
6/16/2009LADSON, SC

Tornado-Reconstructi...800800
9/24/2009Port Neches, TX

Cobblestone-Lane784100
7/30/2009Great Falls, MT

River-House774220
9/7/2009Clinton, NJ

Steel-in-San-Diego772201
9/14/2009San Diego, CA

Williams-New-Home-Si...771110
8/2/2009Windsor, NC

Utah-Casa765200
9/28/2009Saratoga Springs, UT

h20dave761230
7/21/2009waterloo, AL

Dream-site-on-the-La...732200
8/5/2009La Porte, TX

Delisledigs714200
8/22/2009Jacksonville, FL

Lafayette713200
8/11/2009Cramerton, NC

SantaFe-in-AJ693100
8/28/2009Apache Junction, AZ

Austrian-Chalet675580
1/30/2010Twin Lakes, CO

Blessings658100
9/11/2009farmville, NC

httpownerbuilderbook...657100
9/28/2009Cincinnati, OH

digs639100
9/30/2009Tracy City, TN

Holloway604100
10/21/2009Petersburg, VA

WestermanFarm466130
11/10/2009Dickson, TN

DancingPines265200
1/25/2010Clinton, LA

Richfield-Home263100
1/16/2010Richfield, WI

Log-Cabin248150
1/23/2010indianapolis, IN

herbalslim224100
Thursdayshenzhen, IN

The-Kinzel-House209100
1/21/2010New Orleans, LA

Seaton-Station22140
WednesdaySiloam Springs, AR

Loris16110
Thursday

Mark-and-Lisas-Log-C...15440
Wednesdayaltoona, PA
See all journals...
Top Rated Posters
Lists
Name Items
Cabinets2
Faucets2
Georgia builders?2
Granite countertops2
House Features2
Initial thoughts2
next step9
Questions I need ans...3
To Do - Interior16
To Do Exterior7
Water / Sewer2

Home The Book Bookstore Forums Construction
Journals
Owner-Builder
Connections
Resources

I want to say is that if you do plow through old posts, that this forum and That Home Site has been the most useful to me - but it goes both ways - post questions and answers (things you have read etc..) to get relevant topics going. I have also met another O-B through the Connections on this website and they are building locally and we have hit it off and are sharing all our info - that has been really applicable and fun to experience the same issues, 'be in the same boat' so to speak.
by Kari from Spokane, WA


Eric's Forum Posts: 3
Journal Entries: 32
Interview Answers: 170
Average Forum Rating: 3.75
Send Private Message


Image from Eric's blog

Subscribe to this journal...


This journal has been viewed 32749 times.



Newest << >> Oldest


Utilities

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 10/6/2009 1:59:48 PM

METER READING DAYS IN BILLING KWH
DATE CYCLE USAGE
8-Sep-09 33 3600
6-Aug-09 28 3008
9-Jul-09 31 3546
8-Jun-09 32 2384
7-May-09 30 1544
7-Apr-09 28 1177
10-Mar-09 29 1295
9-Feb-09 31 1329
9-Jan-09 31 1560
9-Dec-08 32 1427
7-Nov-08 30 1507
8-Oct-08 29 2100
9-Sep-08 33 3058

Electric Usage over last 12 months.


Comments (4)
Send Private Message

Exterior Pix

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 8/22/2008 12:07:53 PM

Here are a few shots of the finished exterior.  (Well, mostly finished but I won't point out what still needs to be done.)

Photos




Comments (0)
Send Private Message

Energy-Efficient Structures

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 8/20/2008 10:01:45 AM

Energy Wise Structures helped us correctly size our HVAC for our closed-envelope structure. They can be found at: energywisestructures. Contact them while designing your house. They will help with suggestions about wall material, HVAC, etc. When you have your complete floor plan, they will size your HVAC and tell you how much your heating and cooling costs will be per month. They also give you a cost comparison on how much savings you will have versus traditional building materials.

For example, our house with bonus room would be 5,500 sf. Most AC guys would size that @10-12 tons of AC. We are very comfortable with two units at 6.5 tons. All our ductwork was sized by the Energywise folks, so our AC guy just had to install what they recommended. Our heating/cooling has been below the $190/month that the Energywise people stated. That amount however does not cover other electrical loads such as lighting, appliances, etc... just HVAC!


Comments (1)
Send Private Message

Landscape Design

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 6/2/2008 9:55:13 PM

Knifong Environmental Design
duties performed: Overall Site, landscape, and irrigation design
682-478-6627


Comments (0)
Send Private Message

Recommended Contractors

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 4/9/2008 9:08:22 AM

Work/Supplies Company Name Phone
A/C                                                                    Goowin A/C Jim 817-938-3477
Cabinets                                          Olin Piper Cust Cabinets Olin Piper 817-489-2029
Culture Marble Countertops Nor-Tex Kitchen & Bath   940-320-8815
Dirt work                                Duty Dirt Rodger Bridges 940-627-4516
Doors/Windows Nix Door and Window Brian Sooter 817-920-9221
Electrical                                                        Cornerstone Elec. Services John 682-438-7060
Finish Work/Trim                                             Grey Brothers Trim Earl Grey 940-391-3042
Fireplaces  Fort Worth Door Ray 817-925-3720
Flooring Creation Carpet Richard  Courchesne 682.553.3274
Foundation Engineering and soil testing   Whitworth Engineering   817-236-6106
Foundation/Driveway                                  Lampman Concrete Bill Lampman 817-980-8050
Framing                                       Rodway  Rod Woody 817-925-4927
Garage Doors                                     Family Christian Doors Brandon 817-903-8084
Granite Countertops Century Granite and Marble   817-329-9499
ICF Installers ICF Constructors Matt 832-264-6282
Landscaping      Toby 817-692-2029
Lumber                                          Fort Worth Lumber Tom  817-994-4079
Metal Roof Supplies  Mueller metal Buil and Roofs Chad 817-441-1120
Mirrors                                                   Fashion Glass   817-232-3421
Open Cell Foam Insulation                                    Korbin Foam Jim 817-793-3529
Septic System                        Aero Valley Septic Brandon 817-491-9142
Stairs                                                            Trinity Stairs   972-335-0700
Stonework labor only       Miguel 817-726-8214
Tile Work                                                                           Shannon Tile Chad Shannon 817-891-3342

Files

recommended_contractors.pdf


Comments (1)
Send Private Message

Irrigation system

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 8/7/2007

Our irrigation system and landscaping are in.  The irrigation system is called KISSS (www.kisssusa.com).  It is a capillary system that waters at the roots instead of on top of the plants and only uses 20% of the water used by a traditional system.

Photos




Comments (2)
Send Private Message

Slowly but surely!

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 6/27/2007

Tiling is almost complete, there is still a little bit of tile to be installed and then some sealing to be done.  Hopefully that will wrap up by next week.  The hardwood floors are being stained and finished this week, so there's not too much activity to prevent dust from being kicked up.  Most of the fixtures are in, too.  The wood ceiling has also been finished.  It sure seems like the home stretch takes forever, but I think we're starting to see the light at the end of the tunnel... or is that just a can light?

Photos




Comments (2)
Send Private Message

Painting is almost done!

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 6/5/2007

Well, the painters thought they'd be done last weekend but it's taking a little longer.  We do have a lot of different colors, patterns, and things though.  Can you tell which room belongs the the three-year old little girl? :0)  Most of the first floor doors and windows are still taped up, so some of the pictures are pretty dark.  The bathroom vanity countertops are in, and the kitchen countertops are being installed right now.

Photos




Comments (0)
Send Private Message

Permanent doors & finished ceiling.

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 6/1/2007

We finally finished the ceiling and the permanent doors are in.  The painters will be finishing up this weekend.  At the end of our project, we will post a list of all the subs we recommend as well as other resources.  Please check back regularly.

Photos




Comments (3)
Send Private Message

Family room ceiling is half way there!

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 5/17/2007

So far there have only been two of us installing the ceiling, so it's been a little slow.  Today we have plenty of help though, so we should be wrapping it up in no time.

Photos




Comments (0)
Send Private Message

Trim carpenters and hardwood floors.

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 5/11/2007

The trim carpenters are well underway.  Much of the trim is up and the closets are done.  We're still waiting on some of the trim and doors which has slowed progress, but hopefully that will be resolved soon.  The hardwood floors are finally done too.

Photos




Comments (0)
Send Private Message

Cabinets complete & hardwood floors are underway.

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 4/29/2007

The last kitchen cabinet is in and most of the cabinet trim is complete.  We've started the hardwood floors.  We're making progress but it is SLOW.  This is the biggest job that we've undertaken ourselves, but it's worth it.  They look really nice.

Photos




Comments (0)
Send Private Message

Kitchen cabinets are in!

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 4/25/2007

The kitchen cabinets were installed this week.  There is still a little trim work and one cabinet still to come.  Our cabinet makers have been great.  We had some very specific ideas for our cabinets and they had no problems accommodating.  We're really pleased!

Photos




Comments (0)
Send Private Message

Kid's & guest's bath tub surrounds

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 4/23/2007

I finally remembered to take my camera when there was enough light to get some decent pictures of the shower surrounds.  The last of the cabinetry was delivered today --installation begins tommorrow.  Hardwood floor installation has also begun.  Trim carpenters will start as soon as the trim arrives.  It's all coming together!

Photos




Comments (1)
Send Private Message

Stairs, tub surrounds & more cabinetry

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 4/16/2007

The stairs and tub/shower surrounds are done.  It was too dark to get pictures of all of them, so there will be more to follow.  Today more cabinetry went in -- the entertainment center, master bath, and some of the master closet.  The kitchen should be done soon, and that will finish up the cabinetry.

Photos




Comments (4)
Send Private Message

Front exterior pictures

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 4/8/2007

The chimney is almost done.  At this point the exterior is almost complete -- we still lack shutters, permanent doors and a few areas still need metal roof.

Photos




Comments (0)
Send Private Message

Sheetrock, texture, masonry, etc.

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 4/6/2007

Drywall and texture have been completed.  Currently the masons are working on the exterior.  (More exterior pictures to follow.)  And the cabinetmaker has started installing cabinetry.

Photos




Comments (0)
Send Private Message

Frame and Foam

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 3/20/2007

Here are some shots of the inside of the house framing and the Demalac foam as it is being installed on the underside of the roof decking.

Photos




Comments (0)
Send Private Message

Roofing going on!

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 1/25/2007

The roofers have been drying-in the house and now the HVAC, electricians, and plumbers are going to work.

Photos




Comments (1)
Send Private Message

Framing complete, decking done

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 1/10/2007

Well it has been a long time since we have made an entry... the framers are finished.

Photos




Comments (2)
Send Private Message

ICF Pour Day Pictures

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 12/9/2006

Pictures from the day we poured concrete into the ICF forms.

Photos




Comments (2)
Send Private Message

ICF walls are complete

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 12/8/2006

The guys from ICF Constructors made quick work of the ICF walls. They started on Monday at 10:30 and finished pouring Thursday night.

Photos




Comments (0)
Send Private Message

ICF Day 1

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 12/5/2006

Our ICF blocks came in last Saturday. Matt and his ICF Constructors crew got here Monday morning from Houston and started popping chaulk lines. Once that was complete, they glued the first two rows of blocks down while one of his guys and I made window and door bucks. Unfortunately, the rebar did not show up today so tomorrow they will insert the rebar and start moving up to the 10' height.


Comments (0)
Send Private Message

Cables are in and the slab is poured

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 11/30/2006

The plumbers and electrician got the stuff in the pad quickly. We got our pad poured, 174 yards, right before the big freeze hit the Dallas/Fort Worth area. The guy with the white shirt and his hands up is my buddy Mike, who is our GC.

Photos




Comments (0)
Send Private Message

Form Boards are up

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 11/16/2006

Lampman Concrete got the form boards up and are drilling the piers.

Photos




Comments (1)
Send Private Message

Let the dirt work begin.

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 11/9/2006

Rodger and the Duty Dirt crew is here tearing our place up.

Photos




Comments (0)
Send Private Message

Septic System is in!

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 11/9/2006

   Well the septic system is in and tied to the old house.

Photos




Comments (0)
Send Private Message

Building permits finally!

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 11/1/2006

We have the go from the city to pull our permits after their review. Septic guy, Brandon, should be starting any day now while the dirt work begins also. We will be digging a pond at the low point in our property to get enough dirt to build the pad.


Comments (2)
Send Private Message

Building permits and financing in process

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 10/22/2006

We have filed our permit application with the city and the construction loan is being appraised. The cooperative did show up and put some new poles in for the new house. It's our unofficial groundbreaking!

Photos




Comments (5)
Send Private Message

Platting and grading plan... DONE

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 10/9/2006

Well, we are getting close to the big day. Our platting has been filed and the grading plan finished. We just need to get some final bids for the dirt work, get the bank approval and we are pulling permits! I guess it's time to do some negotiating with subs and get the bottom line down!


Comments (0)
Send Private Message

In the platting process

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 9/9/2006

We have completed our survey work and now the property is going to the city for platting. The grading engineer will be getting the cad file from the surveyor, so he will begin the grading and drainage report required by our city. I have attached the elevations to the journal.

Photos




Comments (2)
Send Private Message

Started our journal

Posted to ICF-Keller-Tx by Eric in Roanoke, TX on 8/27/2006

We started our building journal.


Comments (2)
Send Private Message

Newest << >> Oldest



Search
Shopping Cart

View Cart  |   Check-Out


Call us at 1-888-333-BUILD Email to friends! Bookmark this page!
This page took 5.796875 seconds to generate.