on 7/31/2008 7:38:47 AM
The pool and landscape are coming along. We are waiting for the stone caps on top of the water feature, then the finish and final inspection. We may get to swim before summer is over, I hope.
Photos
Comments (0)
Send Private Message
Posted to Avenida-Del-Sol by Phil in Peoria, AZ
on 7/9/2008 2:32:41 PM
More Pics
Photos
|
| Master Bath |
|
|
| Master Bath |
|
|
| Master Bath |
|
|
| Master Bedroom |
|
|
| Niche |
|
|
| Niche |
|
|
| Guest Bedroom |
|
|
| Guest Bath |
|
|
| Office |
|
|
| Wine Room |
|
|
| Front Entrance |
|
|
| Great Room |
|
|
| Kitchen |
|
|
| Wine Room |
|
|
| Game Room |
|
|
| Dining Room |
|
|
| Laundry Room |
|
|
| Casita |
|
|
| Casita Kitchen |
|
|
| Casita Bedroom |
|
|
| Garage |
|
|
| Pantry |
|
Comments (2)
Send Private Message
Posted to Avenida-Del-Sol by Phil in Peoria, AZ
on 7/9/2008 7:44:22 AM
It's been a long time, but we finally moved in. I have not been able to keep my blog up to date but here are a few pics with more to follow.
We ended up building this house for $100 a square foot, and you can see by the pictures we went pretty high end with everything. So if you shop around, it can be done at a reasonable price; as long as you have a budget and stick to it. More to follow!
Photos
Comments (0)
Send Private Message
Posted to Avenida-Del-Sol by Phil in Peoria, AZ
on 1/23/2008 6:55:56 PM
A lot has happened since my last post. We have the roof dried in, lath is going on, electrical is almost roughed in, as is PEX plumbing. The next step is insulation, drywall, and stucco. We applied for temp. power and are waiting for APS to pull wire and install a meter.
Photos
Comments (0)
Send Private Message
Posted to Avenida-Del-Sol by Phil in Peoria, AZ
on 12/7/2007 7:08:34 PM
Hi all, it's been awhile and a lot has happened since my last visit. To start, my plumber friend had to bail because his mother in-law had a stroke, but he was able to inspect our work and give advice, so we roughed it in ourselves. Coyote Concrete poured everything for us in about 10 days. The framers (Firtmann Brothers) started 12/3 with a crew of 6 and installed trusses today 12/7. These guys are great and at a good price. John Firtmann said two weeks at the start and now may finish early. If you need either of these trades, let me know and I can get you their phone #. Until next time, we will be talking about wire, PEX, doors, windows, roof, and stucco.
Photos
Comments (0)
Send Private Message
Posted to Avenida-Del-Sol by Phil in Peoria, AZ
on 10/11/2007 7:56:52 AM
We have been on vac. for two weeks, but we got permits the day before we left on 9/25. We had to raise the pad 18" and Taylor Grading and Hauling brought in about 500 yards of dirt and did a great job of compacting and leveling it while we were gone. Monday I meet with the concrete sub to discuss the layout and they will start Tues. 10/16. I also got some bids on termite pre-treat which they will do at the same time. I found a licensed plumber who is willing to trade out the rough in so that will save a few bucks. Keep you posted.
Photos
Comments (0)
Send Private Message
Posted to Avenida-Del-Sol by Phil in Peoria, AZ
on 8/19/2007
Things seem to be moving along at the county, we received our first review the other day and they kicked our plans back for some simple stuff. This is what usually happens I was told so we have re-submitted the plans with changes and we wait again. We do at least have permit #s and an address now so we are close.
Photos
Comments (0)
Send Private Message
Posted to Avenida-Del-Sol by Phil in Peoria, AZ
on 8/2/2007
We closed on the land Monday, and submitted drawings to the county today for permits. First we have to dig three test holes for septic and have inspected. I will keep you posted how long it takes for permits.
Comments (0)
Send Private Message
Posted to Avenida-Del-Sol by Phil in Peoria, AZ
on 7/4/2007
We finally got drawings yesterday and things are looking up. I took a copy to the bank, gave a copy to a framer for bids, and will talk to an excavator tomorrow. Hopefully we break ground by the end of summer if we get permits soon. The architect told me the county is moving pretty quickly now, about three weeks.
Comments (0)
Send Private Message
Posted to Avenida-Del-Sol by Phil in Peoria, AZ
on 5/26/2007
Our architect called the other day to let me know he didn't have the time to finish our plans. So after three weeks we have to start over with someone I just met yesterday. This guy says it will be at least three more weeks for him and cost $3,000 more, GREAT. Luckily we have until 7/31 to close on the land because the bank needs the cost breakdown, and I need plans to get that to them. Hopefully this is not the way this project will keep going.
Comments (0)
Send Private Message
Posted to Avenida-Del-Sol by Phil in Peoria, AZ
on 5/16/2007
Well today is a big day, we finally have a signed contract on the land we wanted so the journey begins. The architect will be over this weekend to go over plans and ideas. Hopefully we will get them submitted to the county by this month for permits.
Well we ran into our first snag, I found out from the county that we have close on the land before they will let us submit drawings for review. Our close was set for 7-31-07, but we may move that up now once we get our drawings finished in June
Comments (0)
Send Private Message
Posted to Avenida-Del-Sol by Phil in Peoria, AZ
on 5/3/2007
Well today is a big day, we finally have a signed contract on the land we wanted so the journey begins. The architect will be over this weekend to go over plans and ideas. Hopefully we will get them submitted to the county by this month for permits.
Photos
Comments (0)
Send Private Message
Posted to Avenida-Del-Sol by Phil in Peoria, AZ
on 5/3/2007
Well today is a big day, we finally have a signed contract on the land we wanted so the journey begins. The architect will be over this weekend to go over plans and ideas. Hopefully we will get them submitted to the county by this month for permits.
Photos
Comments (0)
Send Private Message
|
|
| Who's Online | | In The Last 20 Minutes | | Mike in Westminster, CO | | Brian in Dome-ville, central, FL | | Matt in Mooresville, NC | | David in Grand Junction, CO | | More Than 20 Minutes Ago | | Paul in Champions Gate, FL | | Mary in Lititz, PA | | Grant in Woodlands, TX | | Joe in hermiston, OR | | Dionne in Omaha, NE | | Rich in Suffolk, VA | | mark in altoona, PA | | Terry in Phoenix / Oracle, AZ | | Martha in Arlington, TX | | Pat in Arnold, CA | | Mancong in Seattle, WA | | Keith in Jeffersonville, GA | | Justin in Bismarck, ND | | marty in pueblo, CO | | Steven in Colorado Springs, CO | | Jennifer in Ft Worth, TX | | Michael in Lawrenceburg, IN | | Jedon in Nevada City, CA | | Albert E in Elgin, TX | | Katie in Mill Creek, WA | | Chris in Lexington, KY | | kemi in orlando, FL | | Alesia in Pulaski, TN | | Stephanie in Siloam Springs, AR | | Rob in Bel Air, MD | | Maynard in Rivera, CA | | Josh in Vernon, CT | | tad in Bastrop, TX | | Tim in Anchorage, AK | | Charles in Layton, UT | | Mark in APO, AE | | Jeff in Provo, UT | | Giancarlo in Long Island, NY | | April in Midland, TX | | Scott in Richmond, VA | | Faye in Marseilles, IL | | Loris | | Kenneth in Lees Summit, MO | | Rick in Cedar Falls, IA | | Michael in Cave Creek, AZ | | Mark in Provo, UT | | Reuben in Oklahoma City, OK |
| Top Forum Evaluators | | Mark in Provo, UT(7,903) | | Paul in Provo, UT(3,832) | | P in North, FL(1,490) | | David in Fredericksburg, VA(1,458) | | Lauren A. in Springville, UT(1,149) | | Dale in Richland, AZ(807) | | Rich in Suffolk, VA(765) | | Grant in Jacksonville, AL(643) | | Steven in Colorado Springs, CO(500) | | Bob in Philadelphia, PA(427) | | Kirsten in Atascadero, CA(301) | | George in wharton, TX(257) | | Lori in Reno, NV(213) | | Kenneth in Lees Summit, MO(200) | | Michael Penn in Dripping Springs, TX(184) | | Chris in Schertz, TX(115) | | Toi in Alachua County, FL(86) | | Justin in Chandler, AZ(52) | | Mary in Lititz, PA(52) | | Danny in Sparta, IL(47) |
|